My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2021 0628
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0628
>
8F Consent 2021 0628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 9:06:10 PM
Creation date
6/23/2021 9:05:49 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/28/2021
Retention
PERM
Document Relationships
Reso 2021-099 CSA RCraneCX
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Amendment No. 1 to <br />Consulting Services Agreement between City of San Leandro and 05/18/21 <br />RCraneCx for the Farrelly Pool Replacement Page 2 of 3 <br />• Preparation of documents related to HVAC, BMS controls, domestic hot water related <br />systems, lighting controls, pool heater and pump, and photovoltaic system. <br />• Meet with the City of San Leandro representatives to present and review criteria from <br />the contract documents. <br />• Meet with each of the MEP and Controls subcontractors individually to review the <br />SoO and provide clarification of this document’s use within their Startup procedure <br />• Develop preliminary Startup Checklists based on manufacturer’s recommendations <br />• Incorporate standard Startup Checklists (provided by subcontractors) <br /> <br />4. Exhibit B of the Agreement entitled “Compensation Schedule & Reimbursable Expenses” is <br />hereby amended as follows: Replace the original section with the following revised section (changes <br />indicated in italics): <br /> <br />Compensation for Professional Services <br />The services described below are included in the fixed fee sum for the tasks listed below, billed <br />monthly as a percentage of completion basis, with reimbursable expenses charged in excess of <br />this amount. <br />Tasks 1.1 thru 1.10 Design Phase $10,000 <br />Tasks 2.1 thru 2.7 Construction Phase $51,600 (revised) <br />Task 3.1 Post Construction Phase $1,000 <br />Subtotal: $62,600 (revised) <br />In addition to the fixed services above, the following items will be paid on a Time and Materials <br />basis per the Hourly Rate and Reimbursable schedules below: <br />Retesting Allowance (as needed) $2,000 (revised) <br />Reimbursable Allowance $500 (revised) <br />Subtotal: $2,500 (revised) <br />The total value for the Fixed Fee professional services and other Time and Materials Allowances <br />above is: <br />TOTAL CONTRACT: $65,100 (revised) <br /> <br /> <br />5. All other terms shall remain in full force and effect. <br /> <br />This Amendment may be executed in multiple counterparts, each of which shall be an original and <br />all of which together shall constitute one agreement. <br /> SIGNATURES ON FOLLOWING PAGE <br />403
The URL can be used to link to this page
Your browser does not support the video tag.