My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2021 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0706
>
8D Consent 2021 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2021 8:03:17 PM
Creation date
7/1/2021 8:03:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/6/2021
Retention
PERM
Document Relationships
Reso 2021-107 Heron Bay Maint Assmt Dist Levy and Collection
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
Reso 2021-108 Engineers Rept Heron Bay Maint Assmt Dist
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 5 <br /> <br /> <br />B. Mitigation and Monitoring <br />Mitigation of the Heron Bay project was accomplished by re-construction of marshlands, <br />tidal marshlands, and upland or high ground for wildlife habitat. In order to verify that the <br />habitat is healthy and in order to identify maintenance requirements a monitoring report <br />was prepared annually for the first 10 years after marsh construction, formal monitoring <br />has ended. . <br /> <br />C. District Reserve Fund <br /> A Maintenance Reserve Fund is maintained by the District in the amount of $300,000 <br /> to fund capital improvements and unexpected or emergency repairs. There have not <br /> been any withdrawals from the reserve fund this past fiscal year and none are <br /> anticipated for the coming fiscal year. <br /> <br />D. Capital Improvement Projects <br />Levee Maintenance <br />The nature of the levees that protect the Heron Bay marshland is such that they require <br />periodic maintenance; specifically, the heavy stone rip rap that prevents erosion shifts, <br />settles, or washes away and needs to be replaced. This work is most efficiently done by <br />an outside contractor in large quantities. A project on the shore near where the bay trail <br />turns eastward and heads toward Bayfront Drive was completed this year. <br /> <br />Trail Maintenance <br />City staff will periodically hire a contractor to complete pavement repairs on sections of <br />the trail where tree roots have damaged the asphalt. The work will involve digging out <br />small sections of pavement, trimming back tree roots and installing new asphalt patches. <br /> <br />Shoreline Signs <br />In conformance with the City’s updated permit with the San Francisco Bay Conservation <br />and Development Commission (BCDC), wayfinding signage along the Bay Trail will be <br />repaired or replaced since the existing signage has been worn by weather and sun- <br />exposure. <br /> <br />Tide Gate Repair <br />City staff completes repairs to tide gates on an as-needed basis to assure their proper <br />operation. Repairs include; reconnecting the flap gates and the frames, replacing rotted <br />sections of the drain pipes, reattaching the screen latch connections, replacing damaged <br />screen bars and screens, and installing associated stainless-steel lubrication tubings. <br />1347
The URL can be used to link to this page
Your browser does not support the video tag.