My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2021-113 Adopt 2021 CAP and Addendum to 2035 General Plan
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2021
>
Reso 2021-113 Adopt 2021 CAP and Addendum to 2035 General Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:35:21 PM
Creation date
7/26/2021 12:56:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/19/2021
Retention
PERM
Document Relationships
5A Public Hearings 2021 0719
(Approved)
Path:
\City Clerk\City Council\Agenda Packets\2021\Packet 2021 0719
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2021 CLIMATE ACTION PLAN <br />ADDENDUM NO.1 TO THE GENERAL PLAN UPDATE ENVIRONMENTAL IMPACT REPORT <br />CITY OF SAN LEANDRO <br />1. Introduction <br />Where none of the conditions specified in CEQA Guidelines Section 151621 are present, the lead agency <br />must determine whether to prepare an Addendum or whether no further CEQA documentation is required <br />(CEQA Guidelines Section 15162[b]). An Addendum is appropriate where some changes or additions to the <br />previously Certified EIR are necessary, but there are not any new or substantially more severe significant <br />impacts (CEQA Guidelines Section 15164). <br />In accordance with the CEQA Guidelines, the City has determined that an Addendum to the Certified EIR is <br />the appropriate environmental clearance for the Modified Project because, as provided herein, none of the <br />conditions analyzed under the City's General Plan Update EIR have changed, nor does the proposed 2021 <br />CAP meet any of the criteria for preparing a subsequent or supplemental EIR. (The 2021 CAP will not have <br />one or more significant effects not discussed in the General Plan Update EIR, nor does the CAP create <br />substantially more severe significant effects than previously examined in the General Plan Update EIR.). This <br />Addendum reviews the changes proposed by the Modified Project and examines whether, as a result of any <br />changes or new information, a subsequent EIR would be required. This examination includes an analysis of <br />the provisions of CEQA Section 21166 and CEQA Guidelines Section 15162 and their applicability to the <br />Modified Project. <br />This Addendum No. 1 does not reevaluate impacts that have already been addressed and/or mitigated by <br />the Certified EIR. Impacts that would remain the same or would not increase the level of severity with <br />implementation of the proposed modifications to the project are assumed to be fully analyzed by and <br />consistent with the Certified EIR and are not analyzed in this Addendum. <br />1 See also Section 15163 of the CEQA Guidelines, which applies the requirements of Section 15162 to supplemental EIRs. <br />May 11, 2021 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.