My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt to Conditions 14505 and 14509 Catalina St
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2021
>
Agmt to Conditions 14505 and 14509 Catalina St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2021 1:24:57 PM
Creation date
8/2/2021 1:24:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/22/2021
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Project Requirements. This project shall meet the requirements of Chapter <br />38 of the CFC 2016 edition. Post -Process purification and winterization shall <br />meet the requirements of Section 3803.4 of the CFC 2016 edition. <br />5. Equipment Listing and Certification. All equipment (Fume hoods, ovens, <br />presses, etc.) must be listed for the activities being performed and evaluated <br />by the engineer of record and certified by a listing agency. <br />6. Plan Compliance. Plans to meet building and fire codes adopted at time of <br />building plan submittal. <br />7. Additional Comments/Information May be Required. Additional comments, <br />permits, and requirements, may be issued at time of submittal based on any <br />additional information regarding occupancy class, hazardous materials, <br />building construction, etc. <br />FIRE DEPARTMENT CONDITIONS OF APPROVAL FOR THE BUILDING PERMIT <br />APPLICATION: <br />8. Extraction. The extraction processes shall be located in a room or area <br />dedicated to said extraction (3904.3 Location). Volatile extractions (Type 7) <br />are prohibited. <br />9. Processing. Post processing and winterization involving the heating or <br />pressurizing of the miscella to other than normal pressure or temperature shall <br />be approved and performed in an appliance listed for such use. Domestic or <br />commercial cooking appliances shall not be used (3903.4 Post -process <br />purification and winterization). <br />10. Construction. Processing shall be located in a building complying with the <br />California Building Code (3901 Construction). <br />11. Industrial Ovens. The use of Industrial Ovens shall comply with Chapter 30. <br />(3903.1 Industrial Ovens). <br />12. Identification of Equipment. Provide listings on all equipment. <br />13. Technical Report. Provide a Technical Report for review. <br />14. Hazardous Materials Identification. Provide a list of all hazardous material to <br />be used in the building (flammable combustible liquids, gases, aerosols, <br />solids, etc.) <br />15. Building Permit Submittal. A "Deferred Submittal" is required for the Gas <br />Page 8 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.