Laserfiche WebLink
4. Project Requirements. This project shall meet the requirements of Chapter <br />38 of the CFC 2016 edition. Post -Process purification and winterization shall <br />meet the requirements of Section 3803.4 of the CFC 2016 edition. <br />5. Equipment Listing and Certification. All equipment (Fume hoods, ovens, <br />presses, etc.) must be listed for the activities being performed and evaluated <br />by the engineer of record and certified by a listing agency. <br />6. Plan Compliance. Plans to meet building and fire codes adopted at time of <br />building plan submittal. <br />7. Additional Comments/Information May be Required. Additional comments, <br />permits, and requirements, may be issued at time of submittal based on any <br />additional information regarding occupancy class, hazardous materials, <br />building construction, etc. <br />FIRE DEPARTMENT CONDITIONS OF APPROVAL FOR THE BUILDING PERMIT <br />APPLICATION: <br />8. Extraction. The extraction processes shall be located in a room or area <br />dedicated to said extraction (3904.3 Location). Volatile extractions (Type 7) <br />are prohibited. <br />9. Processing. Post processing and winterization involving the heating or <br />pressurizing of the miscella to other than normal pressure or temperature shall <br />be approved and performed in an appliance listed for such use. Domestic or <br />commercial cooking appliances shall not be used (3903.4 Post -process <br />purification and winterization). <br />10. Construction. Processing shall be located in a building complying with the <br />California Building Code (3901 Construction). <br />11. Industrial Ovens. The use of Industrial Ovens shall comply with Chapter 30. <br />(3903.1 Industrial Ovens). <br />12. Identification of Equipment. Provide listings on all equipment. <br />13. Technical Report. Provide a Technical Report for review. <br />14. Hazardous Materials Identification. Provide a list of all hazardous material to <br />be used in the building (flammable combustible liquids, gases, aerosols, <br />solids, etc.) <br />15. Building Permit Submittal. A "Deferred Submittal" is required for the Gas <br />Page 8 of 17 <br />