My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2021 0907
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 0907
>
10A Action 2021 0907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 9:35:27 AM
Creation date
9/2/2021 5:20:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/7/2021
Retention
PERM
Document Relationships
Reso 2021-132 Renewable 100 for SL Customers by EBCE
(Approved)
Path:
\City Clerk\City Council\Resolutions\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 21-497 <br />Because the City initially enrolled all municipal accounts in the Brilliant 100 plan (which will sunset <br />as of 12/31/21), opting up to the Renewable 100 plan will cost the City approximately $83,000 <br />more annually (or approximately 14.1% more). Existing accounts are scattered over multiple <br />internal budget accounts, including both general fund and non-general fund accounts. Although the <br />City’s current rate plan for municipal accounts is sunsetting, even without opting up to Renewable <br />100, the total budgetary impact on municipal accounts based on the rate structure changes <br />recently implemented by both PG&E and EBCE result in an increase of approximately $58,000 <br />annually (a 5.8% increase over existing rates). <br />ATTACHMENT(S) <br />None. <br />PREPARED BY: Debbie Pollart, Director, Public Works Department <br />Page 5 City of San Leandro Printed on 9/2/2021 <br />497
The URL can be used to link to this page
Your browser does not support the video tag.