My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2021-124 Final Map DR Horton Bay
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2021
>
Reso 2021-124 Final Map DR Horton Bay
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:43:13 PM
Creation date
9/16/2021 10:50:51 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/7/2021
Retention
PERM
Document Relationships
8F Consent 2021 0907
(Approved by)
Path:
\City Clerk\City Council\Agenda Packets\2021\Packet 2021 0907
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. The proposed project is in the Oro Loma Sanitary District service area. The applicant shall <br />contact Oro Loma Sanitary District (510-276-4700) for specific sanitary sewer connection <br />and discharge requirements, and shall submit a copy of Oro Loma Sanitary District Sewer <br />Permit to the City prior to Encroachment Permit Issuance. <br />14. The applicant shall locate all electric and communications utilities serving the site <br />underground. <br />15. All proposed storm drain inlets and trench drains shall be marked "NO DUMPING, <br />DRAINS TO BAY" as per the City of San Leandro Standard Plan Dwg. No. 204. All <br />proposed storm drain inlets that are not within bioretention areas shall have trash capture <br />devices. This note shall be included on Building Permit plan set. <br />16. Building Permit plans shall show that all abandoned driveways or damaged curb, gutter <br />and/or sidewalk shall be removed and replaced according to City standard Plans Dwg. No. <br />100, 102 and 104. Plans shall show ADA path grades and control point elevations across <br />the proposed driveway on Manor Boulevard. <br />17. Sign installations must be per City of San Leandro Standard Plans Dwg. No. 136. <br />18. The City's traffic impact fee program is called "Development Fee for Street <br />Improvements" (DFSI). According to the adopted 2019-20 Fee Schedule, the rate for <br />"General Residential" land use is $1,449.91 per unit. Credit for existing 28,687 gross SF <br />building for "Personal Service" land use category at the rate of $2.41 will be assumed and <br />as such no DFSI is due for this project. <br />19. The project is within the Marina Boulevard/Interstate 880 Interchange Traffic Impact Fee <br />Zone. According to the adopted 2019-20 Fee Schedule, the rate for "General Residential" <br />land use is $729.28 per unit. Credit for existing 28,687 gross SF building for "Personal <br />Service" land use category at the rate of $2.47 will be assumed and as such no fee is due for <br />this project. <br />20. A Park Facilities Development Impact Fee shall be assessed assuming 39 dwelling units <br />(du) will be added to the property as follows: <br />Park Land Acquisition Fee: $14,667.00/du or $572,013.00 <br />Park Improvement Fee: $2,348.00/du or $91,572.00 <br />Total Park Impact Fee: $17,014.00/du or $663,546.00 <br />Please note that this is an estimated amount. These fees are subject to change at the start of <br />each fiscal year and will not be vested until issuance of building permit. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.