Laserfiche WebLink
the proposed point of service? How will the bins get to the point of service? <br />See MF Dwelling Enclosure Guidelines at www.RecycieSanLeandro.org. <br />D. Driveways and/or travel aisles shall provide unobstructed access for <br />collection vehicles and personnel. <br />E. Applicant/Property Owner must ensure that there is adequate space for a <br />collection vehicle to enter and exit the property in order to service each <br />container (dumpster, compactor or roll -off). <br />F. Trash enclosure must be of sufficient size to keep one dumpster under each <br />chute, plus enough space to keep a spare dumpster for each (to be utilized <br />on service days). <br />G. If gates with locks are planned to limit access to the property, then the <br />Applicant/Property Owner must provide keys or cards to the franchised <br />waste hauler. If keys or cards are not provided, then the Applicant/Property <br />Owner must ensure that all secured gates are open at 6:00 a.m. for <br />collection. <br />H. The property owner, occupant and tenants shall maintain enclosure(s)/trash <br />chute termination rooms free of litter and other debris in accordance with the <br />San Leandro Municipal Code §3-15-215. The franchised waste hauler is <br />responsible for replacement of containers in the event that they are in a <br />condition of disrepair. <br />I. Per the San Leandro Municipal Code §3-1-200, storage of solid waste, <br />recycling, and other materials outside of the enclosure that is visible from the <br />street is prohibited at all times. <br />9. The project site is within the Waste Management of Alameda County (WMAC) <br />service area. Refer to the franchised waste hauler for further assistance with <br />capacity needs and container sizes: Alameda County Industries (510) 613-8710. <br />XI. EAST BAY MUNICIPAL UTILITY DISTRICT <br />Water Service. When the development plans are finalized, the project sponsor <br />shall contact EBMUD's New Business Office and request a water service <br />estimate to determine the costs and conditions of providing water service to the <br />development. Engineering and installation of water mains and meters requires <br />substantial lead time, which should be provided for in the project sponsor's <br />development schedule. The project sponsor should be aware that Section 31 of <br />EBMUD's Water Service Regulations requires that water service shall not be <br />furnished for new or expanded service unless all of the applicable water - <br />efficiency measures described in the regulation are installed at the project <br />sponsor's expense. Due to EBMUD's limited water supply, all customers should <br />plan for shortages in time of drought. <br />XII. CONSTRUCTION PROVISIONS <br />Construction Easements. All construction activities shall be conducted on the <br />project site unless appropriate construction easements are obtained from <br />neighboring property owners. <br />Agreement to Conditions August 3, 2021 <br />PLN20-0022 15693 E. 14th Street Page 15 of 20 <br />