Laserfiche WebLink
charge developer, and developer shall pay, for all costs of sweeping city streets <br />in the vicinity of the project as necessary to control dust and spillage. <br />A. Dust. Standard construction dust control procedures, such as wetting, <br />daily roadwashing and other maintenance functions to control emissions, <br />shall be implemented at all times during outdoor construction. Dust <br />generating activities such as grading, excavation, paving etc., shall be <br />scheduled the early morning and other hours when wind speeds are low. <br />All construction activities entailing soil disturbance shall cease when <br />winds exceed 30 miles per hour as an hourly average. <br />B. Noise. Procedures with the highest noise potential shall be scheduled for <br />daylight hours, when ambient noise levels are highest. The contractor(s) <br />shall be required to employ the quietest among alternative equipment or <br />to muffle/control noise from available equipment. <br />8. Truck Route Plan. The developer shall prepare a construction truck route plan <br />that would restrict trucks to arterial streets that have sufficient pavement section <br />to bear the heavy truck traffic, thereby minimizing noise and traffic impacts to the <br />community. The construction truck route plan shall be reviewed and approved <br />by the City Traffic Engineer prior to receipt of the grading permit. <br />9. Truck Hauling Hours. Truck hauling activities shall be restricted to 7:00 a.m. to <br />5:00 p.m. There shall be no truck hauling activity on Saturdays, Sundays and <br />legal holidays. <br />10. Maintenance. During the construction phase, the site shall be well maintained in <br />a neat manner, free of weeds, litter and debris. <br />11. Secure Construction Site. The property shall be secured during construction with <br />a six (6) foot high chain link fence and any other security measures in <br />accordance with recommendation of the San Leandro Police Department. <br />12. Pest and Vermin Control. Pest and vermin control shall be instituted prior to the <br />demolition and construction of the project. <br />13. Construction Facilities. Potable water and temporary sanitary facilities shall be <br />provided to workers during construction activities. Temporary sanitary facilities <br />shall be kept in a clean and odorless condition, secured, and located away from <br />nearby residences. <br />14. Construction Contact. Adjacent businesses and residents shall be provided with <br />the contact information of the responsible site foreman or managing general <br />contractor during periods of grading and construction. <br />15. Conditions of Approval. A copy of these Conditions of Approval shall be identified <br />on the plans submitted with the building permit application and posted or made <br />available on the job site during construction. <br />XIII. MAINTENANCE <br />1. Maintenance. The project site and public right-of-way shall be well maintained <br />and shall be kept free of litter, debris, and weeds at all times. Post construction, <br />Agreement to Conditions August 3, 2021 <br />PLN20-0022 15693 E. 14th Street Page 17 of 20 <br />