My WebLink
|
Help
|
About
|
Sign Out
Home
Stormwater Trmt Measure Amdt 1 11032020
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2020
>
Stormwater Trmt Measure Amdt 1 11032020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 6:00:56 PM
Creation date
11/17/2021 10:52:12 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
11/3/2020
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Project Description <br />1.1 PROPERTY OWNER <br />Project Address: 2000 Marina Blvd. <br />San Leandro, CA 94577 <br />APN 77A-700-3 <br />Property Owner: <br />2000 Marina LLC, a Delaware Limited Liability Company <br />Attn: Timur Tecimer <br />19300 South Hamilton Ave., Ste. 200 <br />Gardena, CA 90248 <br />310-354-2460 <br />Party Responsible for <br />2000 Marina LLC, a Delaware Limited Liability Company <br />Operations and <br />Attn: Timur Tecimer <br />Maintenance: <br />19300 South Hamilton Ave., Ste. 200 <br />Gardena, CA 90248 <br />310-354-2460 <br />zCCIP ���N►4- uc <br />is the property owner and is also responsible for the operations and maintenance <br />of the stormwater treatment devices herein. <br />1.2 SITE MAP <br />Please see Exhibit B. <br />1.3 TREATMENT DESCRIPTION AND MAINTENANCE PLAN <br />The property contains four bioretention areas, located as described below and as shown in the attached site <br />plan. A bioretention area is a vegetated shallow depression that is designed to receive, retain, and infiltrate <br />rainwater runoff from sheet flow. The bioretention area provides a vegetated surface underlain with planting <br />media, gravel, and a subsurface drain pipe. <br />Bioretention Area 1 is located along the southwestern edge of the property, parallel to Menlo Street. <br />Bioretention Area 2 is located along the southern property line, adjacent to the southwest corner of the <br />property, parallel to Marina Boulevard. <br />Bioretention Area 3 is located along the southern property line, east of bioretention area 2, parallel to Marina <br />Boulevard. <br />Bioretention Area 4 is located along the southern property line, east of bioretention area 3, parallel to Marina <br />Boulevard. <br />- -- - --Bioretention=Area=5=is=located-at=the=southeast-corner=of-th"ite,-and=exists=on=both=the east=and-west=side= _- <br />of the driveway on Marina Boulevard, connected via equalizer pipe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.