My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2021 1206
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1206
>
8D Consent 2021 1206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2021 8:22:37 PM
Creation date
12/2/2021 8:22:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/6/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 21-627 <br />also replaced the entire pool deck slab to provide appropriate surface slopes for everyone’s <br />safety. <br />Concurrently, the San Leandro Boys and Girls Club facility also underwent renovation, in which <br />staff cooperated with the Boys and Girls Club construction team to maintain cohesion between <br />both projects. To alleviate issues regarding the shared locker rooms between the Club and pool <br />patrons, and to avoid slip and falls, the City agreed to share the costs to improve the drainage in <br />the locker rooms. In addition, the Council authorized the transfer of funds to Boys and Girls Club to <br />cover the cost of modifying the layout of the tiles to comply with ADA requirements and, also to <br />install additional floor drains throughout the locker rooms. The City has also funded frontage <br />improvements consisting of new driveway approaches, new sidewalk, and a new ADA parking <br />stall within the roadway. <br />Analysis <br />The work has been completed, inspected and was found in compliance with the contract <br />documents and City standards. <br />Current Agency Policies <br />·Maintain and enhance San Leandro’s infrastructure <br />Previous Actions <br />·On April 6, 2020, by Resolution No. 2020-030, the City Council awarded a construction <br />contract to McNely Construction for $912,289 and appropriated $975,000 of General <br />Funds <br />·On January 19, 2021, by Resolution No. 2020-614, the City Council approved an increase <br />to the Contract Change Order Cap Authorization by $55,868 from 15% at $136,843 to <br />21% at $192,711 for the Original Construction Contract Amount of $912,289 with McNely <br />Construction; Authorized a Contract Change Order in the amount of $48,629.09 for the <br />Boys and Girls Club Pool Resurfacing Project, Project No. 2018.3400; and Authorized the <br />Transfer of $51,767 to the Boys and Girls Club for Improvements to the Shared Locker <br />Rooms <br />Applicable General Plan Policies <br />Goal OSC-1: Maintain and improve San Leandro’s parks and recreational facilities <br />·Policy OSC-1.4: Priority on Renovation <br />Permits and/or Variances Granted <br />Alameda County Health Department approval was obtained for this project. <br />Page 2 City of San Leandro Printed on 12/2/2021 <br />56
The URL can be used to link to this page
Your browser does not support the video tag.