My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2021 1213
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1213
>
5A Public Hearings 2021 1213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:29:35 AM
Creation date
12/10/2021 10:27:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/13/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ALL INCLUDED CONTENTS PRODUCED BY CLIMATEC ARE AGREED TO BE PROPRIETARY AND CONFIDENTIAL <br />AND NOT TO BE SHARED WITH ANY NON-CITY PERSONNEL <br />ALL INCLUDED CONTENTS PRODUCED BY CLIMATEC ARE AGREED TO BE PROPRIETARY AND <br />CONFIDENTIAL AND NOT TO BE SHARED WITH ANY NON-CITY PERSONNEL <br />11/2/2021 <br />ALL INCLUDED CONTENTS PRODUCED BY CLIMATEC ARE AGREED TO BE PROPRIETARY AND <br />CONFIDENTIAL AND NOT TO BE SHARED WITH ANY NON-CITY PERSONNEL <br />Heating, Ventilation, & Air Conditioning (HVAC ) & Indoor Air Quality (IAQ) <br />▪New Packaged/Split System HVAC Systems with Economizers & MERV 13 Filters at 13 Sites <br />▪New Air Handling Units at City Hall and Public Safety Buildings <br />▪New Central Plant Chillers and Pumps at City Hall & Public Safety Buildings <br />▪Refurbish Duct Heaters/ FCUs at City Hall <br />▪New MERV 17 Portable Air Filtration Systems in Spaces with Limited Fresh Air <br />Building Automation System (BAS) <br />▪New JCI BAS at 4 Sites <br />▪Recommission Existing Metasys BAS at 8 Sites <br />‒Verify Sequence of Operations – Heating, Cooling, Economizer <br />‒Verify Proper Operation of Control Valves and Existing Economizers <br />▪Repair Problematic Lighting Control Panel at Main Library <br />LED Lighting <br />▪Interior LED Lighting Modernization at 14 Sites <br />▪Exterior LED Lighting Modernization at 9 Sites <br />Pool Pump VFD & Controls <br />▪New Pool Pump VFD at San Leandro Aquatic Center <br />Street Lighting Controls <br />▪Upgrade & Expand Paradox Controls <br />‒ New Gateways & Nodes on Existing LED Fixtures (995) <br />‒Integrate New Nodes & Gateways into Existing Paradox CMS <br />‒Upgrade Existing Paradox System to Neptune Generation <br />Turnkey Infrastructure Improvements Budget ......................................... $4,994,884 <br />Funding Sources: <br />ECAA 1% Funding .................................................................... $1,284,140 <br />City Capital ............................................................................. $ 395,828 <br />American Rescue Plan (ARP) ..................................................... $3,314,916 <br />168
The URL can be used to link to this page
Your browser does not support the video tag.