My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2021 1213
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1213
>
5A Public Hearings 2021 1213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:29:35 AM
Creation date
12/10/2021 10:27:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/13/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Installation Agreement – Att A <br />Page 3 of 17 <br />•Replacement of existing spring isolators on existing equipment curb. <br />•Disconnection/reconnection to the existing BAS. <br />•Start-up/testing of the new unit. <br />•Final engineering will determine new chiller design specifications. <br />The Scope of Work excludes: <br />•Electrical upgrades/modifications not specifically included in the scope. <br />•Repairs and/or modifications to either the existing structural support or to the roofing. <br />•Repairs such as, but not limited to, water leaks, expansion tanks, piping, valves/actuators, <br />chiller water feed, associated water circulating pumps and associated controls, not <br />specifically included in the scope. <br />Replace one (1) air handling unit with a new high efficiency unit of similar size and capacity. Please <br />refer to the HVAC Mechanical Inventory for equipment size and location. <br />The Scope of Work includes: <br />•Removal and proper disposal of the existing unit per EPA guidelines. <br />•Installation of one (1) new air handling unit with chilled water coil and variable frequency <br />drive (VFD). <br />•Necessary piping modifications at the inlet and outlet of the replacement unit. <br />•Replacement of one (1) chilled water control valve. <br />•Duct modifications needed to install unit. <br />•Disconnection/reconnection of the existing electrical service. <br />•Disconnection/reconnection to the existing BAS. <br />•Start-up/testing of the new unit. <br />The Scope of Work excludes: <br />•Undisclosed electrical and structural upgrades/modifications. <br />•Unforeseen repairs to existing equipment such as, but not limited to, water leaks, piping, <br />valves/actuators, and associated controls not listed in above scope. <br />•Asbestos removal or remediation. <br />Refurbish twelve (12) existing fan coil units. Please refer to the HVAC Mechanical Inventory for <br />equipment information. <br />The Scope of Work includes: <br />•Replacement of the existing blower motors. <br />•Replacement of the existing belts and adjustment of pulleys. <br />•Clean the interior of each unit and coil. <br />•Perform air flow measurements at the inlet and outlet of each unit. <br />•Start-up and testing of the units. <br />•Documentation of equipment deficiencies and recommendations for any further repairs. <br />The Scope of Work excludes: <br />•Undisclosed electrical and structural upgrades/modifications. <br />•Replacement the fan coil units or controls on the units. <br />•Replacement of existing hot water or chilled water coils and control valves. <br />36
The URL can be used to link to this page
Your browser does not support the video tag.