My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2021 1213
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2021
>
Packet 2021 1213
>
5A Public Hearings 2021 1213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 10:29:35 AM
Creation date
12/10/2021 10:27:59 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/13/2021
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Installation Agreement – Att A <br />Page 10 of 17 <br /> <br />• Start-up/testing of the new units. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br />• Roofing other than repairs required for new roof curb adapters. <br /> <br />Main Library <br />Controls <br /> Recommission the existing Johnson Controls BAS. <br /> <br />The Scope of Work includes: <br />• Verify control components wired to each controller, including disconnecting wire to <br />confirm failures are reporting correctly. <br />• Verify operation of all phases for each piece of HVAC equipment connected to the BAS <br />in heating, cooling and/or economizer modes. <br />• Verify valve and/or damper actuators are operating correctly according to the control <br />signals. <br />• Reprogram equipment occupied/unoccupied schedules and set points according to <br />facility occupied hours. <br />• Provide a system start-up and report indicating system deficiencies. <br />The Scope of Work excludes: <br />• Any repair or replacement of existing control system components. <br /> <br />Mechanical <br /> Replace two (2) packaged HVAC units with new high efficiency units of similar size and capacity. <br />Please refer to the HVAC Mechanical Inventory for equipment size and location. <br /> <br />The Scope of Work includes: <br />• Removal and proper disposal of the existing units per EPA guidelines. <br />• Proper disposal or containment of refrigerant. <br />• Installation of two (2) new packaged units. <br />• Duct/curb modifications needed to install units. <br />• Disconnection/reconnection of the existing electrical and gas service. <br />• Installation of new electrical disconnects. <br />• Protective coil coatings on the new units. <br />• Installation of economizers and MERV 13 filters as per manufacturer’s recommendations. <br />• Disconnection/reconnection of existing condensate drain lines. <br />• Disconnection/reconnection to the existing BAS. <br />• Start-up/testing of the new units. <br />The Scope of Work excludes: <br />• Undisclosed electrical and structural upgrades/modifications. <br />• Roofing other than repairs required for new roof curb adapters. <br /> <br /> <br /> <br />43
The URL can be used to link to this page
Your browser does not support the video tag.