Laserfiche WebLink
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />Collection System Maps <br />¢ San Leandro, CA <br />Puns ann scharnles U <br />w.•w •.aswaa.o _ <br />E � 4m�mr <br />jj [[ Ff': Ak dfs <br />a MY. �•4.GM <br />,,::Nwp! <br />A1Yt Nws <br />M r <br />Each of the City's 184 base maps are digitized and formatted into an ArcGIS based mapping <br />system. The Geographic Information System (ArcGIS) mapping system is linked to the <br />Collection Department CMMS program, a street directory, and TV inspection Records. The link <br />allows the map to be populated with key data such as pipe size and pipe length. Maps are <br />continuously updated by Engineering as new tracts are accepted, and map corrections are <br />identified by the collection crew based upon field observations. Information Services provides <br />updated map pages to all map holders on a regular basis. <br />Prioritized Preventive Maintenance <br />The crew is equipped with modern equipment, Including one Combo Truck, one Hydro, one <br />Rodder, one CCTV, one Tanker, one 1-ton dump truck, one pickup and one emergency response <br />trailer. The six man crew rotates on a seven day 24/7 standby schedule <br />Computerized Maintenance and Management System (CMMS) <br />ICOM3 is used to manage the collection system preventive maintenance program. Maintenance <br />planning and scheduling is used to establish annual and other periodic maintenance goals. These <br />Page 115 <br />