My WebLink
|
Help
|
About
|
Sign Out
Home
9G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:40:30 AM
Creation date
4/1/2022 9:40:15 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br /> <br />Page | 7 <br /> <br /> <br />If an overflow occurs, the first responder has the responsibility of evaluating the overflow upon <br />arrival, implementing best management practices to contain the overflow and prevent it from <br />entering a storm drain or other channel, contacting the Collections System Maintenance <br />Supervisor, calling additional help if needed, photographing the site, clearing the blockage, and <br />making regulatory notifications if required. <br />The Collections supervisor and Collections workers are each furnished with a City-financed cell <br />phone. Additionally, there are four line-of-sight radios available for use when there are <br />communications issues or during events where crews need radio communications such as <br />confined space entries or main line cleaning and televising. <br />WPCD Sewage Overflow Notification Procedure <br />• Report all spills to a supervisor <br />• Contain the spill <br />• Determine the overflow volume and impact <br />• If volume is more than 1000 gallons, or if overflow reaches water of the state, start the two- <br />hour notification procedure <br />94
The URL can be used to link to this page
Your browser does not support the video tag.