My WebLink
|
Help
|
About
|
Sign Out
Home
9G Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 01182022
>
9G Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:40:30 AM
Creation date
4/1/2022 9:40:15 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br /> <br />Page | 5 <br /> <br /> <br />The City’s sewer system consists of approximately130 miles of pipe, ranging from 6 inches to 42 <br />inches in diameter, and 13 remote lift stations. The sewers in the City system range in age from <br />new to over 70 years old. The oldest sewers are located in the northeastern portion of the City <br />from the Oakland city limits to Castro Street roughly between the Southern Pacific Railroad and <br />MacArthur Boulevard. This portion includes the downtown area and the oldest residential areas <br />of the City. <br />The City maintains roughly two thirds of the sewers within the City limits, primarily serving the <br />northern portion of the City. The remainder of the City is served by the Oro Loma Sanitary <br />District. The sewage from the City sewer system is conveyed to and treated at the San Leandro <br />Water Pollution Control Plant (WPCP). <br />The treatment plant produces high quality secondary effluent at an average dry weather rate of <br />4.8 million gallons per day (mgd). An average of approximately 2.5 dry tons of biosolids suitable <br />for recycling are removed from the plant treatment process each day. <br />Section 1 – Goals <br />D.13.(i) Goals: The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and <br />maintain all parts of the sanitary sewer system. This will help reduce and prevent SSOs, as well as <br />mitigate any SSOs that do occur. <br />The goals the City has established are: <br />• To protect public health and the environment through the proper management of the <br />public wastewater collection system; <br />• To professionally manage, operate and maintain all parts of the public wastewater <br />collection system; <br />• To provide a safe work environment for employees; <br />• To eliminate preventable SSOs; <br />• To understand the condition of and to maintain infrastructure to maximize the life of the <br />collection system; <br />• To be a part of the community and be a responsive public agency; <br />• To provide adequate capacity to convey peak flows; <br />• To effectively operate and maintain the collection system to minimize financial impacts <br />on customers; and <br />• To adhere to the components of the SSMP. <br /> <br />Also included are the following specific goals: <br />• Conduct a system-wide video inspection of all manholes and gravity mains every seven <br />years <br />92
The URL can be used to link to this page
Your browser does not support the video tag.