Laserfiche WebLink
File Number: 22-013 <br />CSG will provide structural design services to ensure that the support structures used for the <br />proposed scoreboards equipment are sufficient and up to current code. CSG will draft structural <br />calculations, structural plans, and an engineer’s cost estimate for the replacements. In addition, <br />CSG will subcontract with American Consulting Engineers Electrical (ACEE) to determine the <br />adequacy of the existing power supply for the proposed scoreboards equipment. <br />The cost of the project includes a 15% contingency in the amount of $8,145 if additional services <br />are required once the site reviews are complete. <br />Fiscal Impacts <br />This ARPA-funded project will cost a not-to-exceed amount of $62,446 which requires no <br />adjustment to the FY 2022-2023 budget. <br />Budget Authority <br />ARPA account 190-17-802-5240 is funded for City Park and Open Space Major Maintenance in <br />FY 2022-2023 which includes the scoreboard replacement project. The CSA for design services <br />will require an administrative budget transfer within the account of $62,446 from 5240 <br />(Construction) into 5120 (Consulting). It is anticipated that the design services will be completed <br />by the end of this fiscal year. <br />ATTACHMENT(S) <br />Attachment(s) to Related Legislative File <br />·Consulting Services Agreement with CSG Consultants, Inc. for Scoreboard Design Services <br />PREPARED BY: Jennifer Auletta, Deputy Public Works Director, Public Works Department <br />Page 2 City of San Leandro Printed on 1/14/2022 <br />152