My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 02222022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 9:57:56 AM
Creation date
4/1/2022 9:57:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Retention
PERM
Document Relationships
Reso 2022-035 Annual Street Overlay Acceptance 2018-2020
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Meeting Date: July 5, 2022 <br />Staff Report <br />Agenda Section:File Number:22-018 CONSENT CALENDAR <br />Agenda Number:9.C. <br />TO:City Council <br />FROM:Fran Robustelli <br />City Manager <br />BY:Sheila Marquises <br />Acting Engineering & Transportation Director <br />FINANCE REVIEW:Susan Hsieh <br />Finance Director <br />TITLE:Staff Report for a City of San Leandro City Council Resolution to Accept a <br />Portion of the Work for the Annual Street Overlay / Rehabilitation 2018-2020 <br />Project, Project No. 2019.0050 <br />SUMMARY AND RECOMMENDATIONS <br />This action accepts the portion of the work on the Annual Street Overlay/Rehabilitation <br />2018-2020, Project No. 2019.0050 that is complete as of December 31, 2021. <br />Staff recommends accepting the completed work. <br />BACKGROUND <br />The City Council awarded the contract for construction of the Annual Street Overlay/Rehabilitation <br />2018-2020 project to DeSilva Gates Construction, LP (DGC) on July 6, 2020. DGC diligently <br />pursued the work until July 16, 2021 when it was discovered that the design grades for several <br />streets were incorrect. Work resumed when revised grades were received from the design team; <br />however, the delay prevented work on Corvallis Street, which is adjacent to Corvallis Elementary <br />School, from being completed during the school summer recess. <br />Work on Corvallis Street was subsequently scheduled for the winter school break, but rain and <br />cold temperatures prevented paving work at that time. This work is now scheduled during the <br />school spring break in April 2022 but may be delayed until summer break if weather is not <br />favorable during spring break. <br />All other work on the contract including paving of Aladdin Avenue, Benedict Court, Bigge Street, <br />Graff Court, Halcyon Drive, Lafayette Avenue, Marina Boulevard, Mendocino Street, Mendocino <br />Court, Mendocino Circle, Oakes Boulevard, Pansy Street, Purdue Street, Rosewood Court, Terra <br />Street, and Williams Street as well as installation of traffic calming measures at various locations <br />was completed in accordance with the plans and specifications for the project. <br />Page 1 City of San Leandro Printed on 3/17/2022
The URL can be used to link to this page
Your browser does not support the video tag.