Laserfiche WebLink
LIMITS OF RIPRAPLIMITS OF RIPRAPLIMITS OF RIPRAPLIMITS OF RIPRAPNOPARKING6 <br />5C <br />3 <br />2C19 <br />4 <br />12C <br />4H 7C <br />52 <br />5 <br />10 <br />10 <br />312STOPSTOPSTOP <br />TT <br />T T <br />TT <br />1 <br />A3.2 <br />____________ <br />3 <br />A3.2 <br />____________ <br />2 <br />A3.2 <br />____________ <br />1 <br />2 <br />5 <br />5 <br />12 <br />3 <br />3 <br />9 <br />13 <br />13 <br />13 <br />13 <br />8 <br />11 11 <br />11 <br />10 <br />35 <br />5 <br />5 <br />7 <br />SAN FRANCISCO BAY <br />438 SF <br />ELEC <br />STAIR 3 <br />K STUDIOSTE <br />3,786 SF <br />RESTAURANT <br />566 SF <br />MEP <br />575 SF <br />LAUNDRY <br />627 SF <br />KITCHEN <br />442 SF <br />LOADING <br />SERVICE CORRIDOR <br />1,597 SF <br />BAR/ <br />DINING/ <br />BUFFET <br />506 SFPOOL EQUIP1,290 SF <br />ADMIN/ OFFICES 479 SF <br />STOR. <br />564 SF <br />BUS. CTR <br />WOMEN <br />1,709 SF <br />FITNESS <br />9,473 SF <br />LOBBYELEVELEV <br />K STUDIOK/QQ <br />K/QQ <br />K/QQ <br />K/QQSTAIR 1K/QQK/QQK/QQ1,429 SF <br />MTG RM <br />93 SF <br />BOH <br />MEN <br />534 SF <br />STAFF <br />268 SF <br />TRASH <br />STAIR 2 <br />1,179 SF <br />MTG RM <br />294 SF <br />STORAGE <br />WOMENMEN9 <br />14 <br />16 <br />16 <br />16 <br />17 <br />2,099 SF <br />RESTAURANT <br />EXTERIOR SEATING <br />269 SF <br />EXT. MTG. <br />14 <br />2' - 0" <br />4 0 ' - 6 " <br />4 8 ' - 1 " <br />PLAN COLOR LEGEND <br />COMMON AREA <br />VERTICAL CIRCULATION / CORES <br />COMMERCIAL RETAIL RESTAURANT <br />SHORT TERM STAY <br />BUILDING UTILITIES "MEP" <br />K/QQ <br />K/QQ <br />K/QQ <br />13 <br />SHEET NOTES <br />NOTE: NOT ALL NOTES ARE USED ON EVERY SHEET. <br />1 PROPERTY LINE <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />BCDC 100' SHORELINE BAND <br />BUILDING ENTRY <br />PARKING, S.C.D. <br />OUTDOOR SEATING, S.L.D., S.C.D. <br />LANDSCPAING, S.L.D., S.C.D. <br />WALKWAY, S.L.D., S.C.D. <br />PASSENGER PICKUP/DROP-OFF <br />POOL & SPA, S.L.D. <br />10 <br />11 <br />12 <br />13 <br />LOADING <br />PAD MOUNTED TRANSFORMER, S.C.D. & S.E.D. <br />BAY TRAIL (N.I.C.) <br />BUILDING STRUCTURE ABOVE <br />14 HIGH CEILING ABOVE <br />15 STAIRS WITH ROOF ACCESS <br />16 ARCHITECTURAL VERTICAL FIN SHADE SYSTEM <br />17 MOVABLE PARTITION <br />18 ROLL-UP DOOR <br />19 FOLDING GLASS DOOR <br />20 GUARDRAIL <br />21 TRELLIS BELOW <br />22 CANOPY BELOW <br />23 GREEN ROOF <br />24 PRIVATE TERRACE W/ DIVIDER <br />25 ROOF DECK <br />26 UNOCCUPIED ROOF <br />27 STAIR AND ELEVATOR TOWER <br />28 ROOFTOP MEP EQUIPMENTS TO BE SCREENED FROM <br />STREET <br />29 SOLAR READY AREA (15% OF TOTAL ROOF AREA) <br />30 ROOF BELOW <br />M O N A R C H B A Y D R .MULFORD POINT DR.SAN FRANCISCO BAYKEY PLAN <br />TRUE <br />Scale <br />Proj #. <br />934 Howard Street <br />San Francisco <br />CA 94103 <br />P. (415) 677-0966 <br />Sheet Title <br />Sheet Size: <br />ALL DRAWINGS AND WRITTEN MATERIAL <br />APPEARING HEREIN CONSTITUTE ORIGINAL, <br />AND UNPUBLISHED WORK OF THE <br />ARCHITECT AND MAY NOT BE DUPLICATED, <br />USED OR DISCLOSED WITHOUT THE <br />WRITTEN CONSENT OF THE ARCHITECT. <br />30 x 42 <br />DRAWN BY <br />Client <br />Stamp <br />Consultant <br />DateIssueRev <br />OFFICIAL USE ONLY <br />As indicated <br />11/17/2021 11:59:06 AMA2.1 <br />2024MONARCH BAY HOTEL /RESTAURANT / MARKETSAN LEANDRO, CAHOTEL -LEVEL <br />1 FLOOR PLAN <br />DJ/YC <br />1" = 20'-0" <br />1PLANNING - HOTEL - BUILDING PLAN - FLOOR 1 <br />PLANNING <br />SUBMISSION 01 <br />05.24.21 <br />PLANNING <br />SUBMISSION 02 <br />11.17.21