Laserfiche WebLink
6. Fire separation between units, and MEP penetration's all rated assemblies shall be <br />listed <br />7. Plans shall be wet stamped by a licensed professional <br />8. Existing office what is the occupancy and occupant load <br />9. Provide accessible parking for office <br />10. Provide accessible path of travel from public right of way and accessible parking to <br />office <br />11. Common use areas shall accommodate accessible activities or provide equivalent <br />facilitation <br />12.All egress routes shall have accessible compliant hardware <br />13. Provide accessible clearances for all accessible spaces <br />14. Existing office restroom shall be accessible <br />15. Provide smoke detectors in new residential unit and CO if gas appliances are being <br />used <br />16. MEP shall not be a deferred submittal <br />Vlll. CONSTRUCTION PROVISIONS <br />1. Construction Hours. Construction on the project site shall not begin prior to <br />7:00 am Monday through Friday, and prior to 8 am on Saturday and Sunday, <br />and shall cease by 7:00 pm each evening, unless otherwise approved by <br />the Chief Building Official. There shall be no construction on Federal <br />holidays. Interior construction shall be permitted outside the above hours <br />provided that construction noise shall not be detectable outside of the <br />structures being built. <br />2. Construction Activity. Construction activity shall not create dust, noise or <br />safety hazards for adjacent residents and properties. Dirt and mud shall not <br />be tracked onto Estudillo Avenue from the project site during construction. <br />IX. GENERAL CONDITIONS <br />1. Maintenance. The property owner, occupants, and tenants shall maintain the <br />project site and ensure that it is free of litter, weeds, and other debris in <br />accordance with San Leandro Municipal Code §3-15-215. <br />Agreement to Conditions May 6, 2021 <br />PLN20-0030 Paee 7 of 9 <br />