My WebLink
|
Help
|
About
|
Sign Out
Home
9C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 05162022
>
9C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 4:21:33 PM
Creation date
5/11/2022 4:21:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/16/2022
Retention
PERM
Document Relationships
Reso 2022-072 MTC Bike Ped TDA allocation
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TDA Article 3 Claim Applications Appendix A Page 1 <br />Resolution No. 2022-XX <br />Attachment A <br />Re: Request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year <br />2022-2023 Transportation Development Act Article 3 Pedestrian/Bicycle Project Funding <br />Findings <br />Page 1 of 1 <br />1. That the City of San Leandro is not legally impeded from submitting a request to the <br />Metropolitan Transportation Commission for the allocation of Transportation Development <br />Act (TDA) Article 3 funds, nor is the City of San Leandro legally impeded from undertaking <br />the project(s) described in “Attachment B” of this resolution. <br />2. That the City of San Leandro has committed adequate staffing resources to complete the <br />project(s) described in Attachment B. <br />3. A review of the project(s) described in Attachment B has resulted in the consideration of all <br />pertinent matters, including those related to environmental and right-of-way permits and <br />clearances, attendant to the successful completion of the project(s). <br />4. Issues attendant to securing environmental and right-of-way permits and clearances for the <br />projects described in Attachment B have been reviewed and will be concluded in a manner <br />and on a schedule that will not jeopardize the deadline for the use of the TDA funds being <br />requested. <br />5. That the project(s) described in Attachment B comply with the requirements of the California <br />Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et seq.). <br />6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the <br />sources of funding other than TDA are assured and adequate for completion of the project(s). <br />7. That the project(s) described in Attachment B are for capital construction and/or final design <br />and engineering or quick build project; and/or for the maintenance of a Class I bikeway <br />which is closed to motorized traffic and/or Class IV separated bikeway; and/or for the <br />purposes of restriping Class II bicycle lanes; and/or for the development or support of a <br />bicycle safety education program; and/or for the development of a comprehensive bicycle <br />and/or pedestrian facilities plan, and an allocation of TDA Article 3 funding for such a plan <br />has not been received by the City of San Leandro within the prior five fiscal years. <br />8. That the project(s) described in Attachment B which are bicycle projects have been included <br />in a detailed bicycle circulation element included in an adopted general plan, or included in <br />an adopted comprehensive bikeway plan (such as outlined in Section 2377 of the California <br />Bikeways Act, Streets and Highways Code section 2370 et seq.) or responds to an immediate <br />community need, such as a quick-build project. <br />9. That any project described in Attachment B bicycle project meets the mandatory minimum <br />safety design criteria published in the California Highway Design Manual or is in a National <br />Association of City and Transportation Officials (NACTO) guidance or similar best practices <br />document. <br />10. That the project(s) described in Attachment B will be completed in the allocated time (fiscal <br />year of allocation plus two additional fiscal years). <br />11. That the City of San Leandro agrees to maintain, or provide for the maintenance of, the <br />project(s) and facilities described in Attachment B, for the benefit of and use by the public.
The URL can be used to link to this page
Your browser does not support the video tag.