My WebLink
|
Help
|
About
|
Sign Out
Home
06062022 Agenda Packet
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06062022
>
06062022 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 12:55:39 PM
Creation date
6/28/2022 12:54:38 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/6/2022
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />Phase 1 <br />BID OPENING Azul Works, Inc.Bay Cities Paving & Grading, Inc.DeSilva Gates Construction, LLC <br />DATE: April 14, 2022 1400 Egbert Avenue 1450 Civic Ct., Bldg. B - #400 11555 Dublin Boulevard <br />TIME: 3:00 pm San Francisco, CA 94124 Concord, CA 94520 Dublin, CA 94568 <br />LOCATION: City Clerk's Office Phone: (415) 558-1507 Phone: (925) 687-6666 Phone: (925) 829-9220 <br />Fax: (415) 558-1556 Fax: (925) 687-2122 Fax: (925) 803-4263 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST <br />Prepared by: N. Castelino <br />Date Approved: 3/9/2022 <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Annual Street Overlay/Rehabilitation 19-21 <br />2020.0050 <br />21-22.009 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />ITEM COSTITEM COST <br />56 Speed Feedback Signs Furnish <br />and Install Speed Feedback <br />Signs and Poles per Plan Sheet <br />65 <br />4 EA $ 8,000.00 $32,000.00 $15,000.00 $60,000.00 $12,755.00 $51,020.00 $13,000.00 $52,000.00 <br />57 10” PVC C900 Pipe 10 LF $ 2,000.00 $20,000.00 $450.00 $4,500.00 $960.00 $9,600.00 $220.00 $2,200.00 <br />58 6” PVC C900 Pipe 4 LF $ 1,500.00 $6,000.00 $450.00 $1,800.00 $1,830.00 $7,320.00 $200.00 $800.00 <br />TOTAL BASE BID: <br />REQUIRED DOCUMENTATION: <br />Agreement to be Bound <br />SUBCONTRACTORS: <br />Griffin Soil Granite Rock Company <br />Columbia Electric, Inc.Rosas Brothers Construction <br />Chrisp Co.Columbia Electric, Inc. <br />Rosas Brothers <br />Anrak Crisp Company <br />Date: <br />Nicole Castelino, Project Manager <br />Date: <br />Austine Osakwe, Senior Engineer <br />25 % Participation NO <br />$4,715,445.00 <br />Reviewed by: <br />Reviewed by: <br />MCK <br />$4,023,111.10 <br />Granite Rock Company <br />YES <br />NO <br />NO <br />received <br />YES <br />YES <br />Bid Bond <br />San Leandro Local Business <br />Addendum #1 <br />$4,891,826.30 $4,954,000.00 <br />YES YES <br />YES YES <br />NO <br />Good Faith Effort received received <br />NO NO <br />YES YES <br />Sierra Traffic Markings, Inc. <br />F3 & Associates, Inc. <br />Columbia Electric, Inc. <br />TDW <br />Bid Summary - Annual Street Overlay Rehabilitation 19-21 Phase 1.xlsx Page 6 of 6 Printed 4/15/2022 @ 1:07 PM <br />4/15/2022
The URL can be used to link to this page
Your browser does not support the video tag.