My WebLink
|
Help
|
About
|
Sign Out
Home
11A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06062022
>
11A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 12:55:55 PM
Creation date
6/28/2022 12:55:39 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/6/2022
Retention
PERM
Document Relationships
Reso 2022-080 CSA Bertrand Fox
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description Reference ExplanationProposed FeesCurrent Fee <br />ENGINEERING AND TRANSPORTATION DEPARTMENT (continued) <br />5 Park Facilities Development Impact Fees (2)SLMC §7-13-100 <br /> Park Land Acquisition Fee:SLAC §8.8.100 <br /> Single Family SLMC §7-1-820 $17,670 Increase based on Shelter component <br />of SF Bay Area CPI of 1.008 <br /> Multi-Family $15,444 Increase based on Shelter component <br />of SF Bay Area CPI of 1.008 <br /> Special Unit $7,723 Increase based on Shelter component <br />of SF Bay Area CPI of 1.008 <br /> Accessory Dwelling Unit (3)$6,693 maximum (No fee when <750 sq. ft.)Increase based on Shelter component <br />of SF Bay Area CPI of 1.008 <br /> Park Improvement Fee: <br /> Single Family $3,009 8% increase based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Multi-Family $2,630 8% increase based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Special Unit $1,315 8% increase based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Accessory Dwelling Unit (3)$1,140 maximum (No fee when <750 sq. ft.)8% increase based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Total Acquisition and Improvement Fee: <br /> Single Family $20,679 0.08% Shelter component of SF Bay <br />Area CPI & 8% based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Multi-Family $18,074 0.08% Shelter component of SF Bay <br />Area CPI & 8% based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Special Unit $9,038 0.08% Shelter component of SF Bay <br />Area CPI & 8% based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br /> Accessory Dwelling Unit (3)$7,833 maximum (No fee when <750 sq. ft.)0.08% Shelter component of SF Bay <br />Area CPI & 8% based on Engineering <br />News Records Construction Cost Index <br />base year 1967 <br />6 Grading Permits:SLMC §7-12-200 <br />A. Permit $65 <br />B. Inspection $136.00/hr Based on staff cost <br />C. Inspection Deposit <br />D. Plan Review Plan Check Engineer=$166.00/hr; Sr. Engineer=$203.00/hr Based on staff cost <br />Principal Engineer=$224.00/hr Based on staff cost <br />E. Performance Bond SLMC §7-12-605 <br />F. Erosion and Sediment Control Bond SLMC §7-12-610 <br />7 Public Works Projects: <br />A. City Standard Plans (Printed or CD) <br />B. Bidder: City Projects Plans & Specification Documents purchased at City <br />C. Bidder: City Project Plans & Specification Documents purchased via mail <br />8 Overhead Utility Conversion <br />A. Residential Development SLMC §5-3-325 <br />Underground Utility <br /> ii) $1,774.06 per dwelling unit, or 8% increase based on Engineering <br />News Records Construction Cost Index <br />As determined by City Engineer <br />Estimated cost for erosion and sediment control <br />Lesser of: <br />i) Actual cost per linear foot of property frontage, or <br />$10.00 <br />ii) $1,642.99 per dwelling unit, or <br />Direct Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costs Direct Costs (rounded to nearest $5) or a minimum of $25.00 + mailing costs <br />Lesser of: <br />i) Actual cost per linear foot of property frontage, or <br />As determined by City Engineer <br />Estimated cost for erosion and sediment control <br />$10.00 <br />Direct Costs (rounded to nearest $5) or a minimum of $25.00 Direct Costs (rounded to nearest $5) or a minimum of $25.00 <br />$129.00/hour <br />As determined by City Engineer <br />Plan Check Engineer = $157.00/hour; <br />Principal Engineer = $211.00/hour <br />$20,310 <br />$17,752 <br />$8,877 <br />$7,693 maximum (No fee when <750 sq. ft.) <br />$1,055 maximum (No fee when <750 sq. ft.) <br />$17,523 <br />$15,316 <br />$7,659 <br />$65 <br />As determined by City Engineer <br />$6,638 maximum (No fee when <750 sq. ft.) <br />$2,787 <br />$2,436 <br />$1,218 <br />10
The URL can be used to link to this page
Your browser does not support the video tag.