Description Current Fee Reference Proposed Fees Explanation
<br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)
<br />B. Permit Fee (continued)
<br />iii) Stand-Alone Electrical Permit
<br />Up to $2,000 $105 CPI, 4.2% increase
<br />$2,001 to $5,000 $209 CPI, 4.2% increase
<br />$5,001 to $10,000 $209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to
<br />and including $10,000
<br />CPI, 4.2% increase
<br />$10,001 and up $418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof
<br />over $10,000
<br />CPI, 4.2% increase
<br />iv) Stand-Alone Mechanical Permit
<br />Up to $2,000 $105 CPI, 4.2% increase
<br />$2,001 to $5,000 $209 CPI, 4.2% increase
<br />$5,001 to $10,000 $209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to
<br />and including $10,000
<br />CPI, 4.2% increase
<br />$10,001 and up $418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof
<br />over $10,000
<br />CPI, 4.2% increase
<br />v) Residential 1 and 2 Family Re-roof
<br />a) Main dwelling roof $292 all sizes and materials CPI, 4.2% increase
<br />b) Detached garages and accessory structures on same property as main dwelling and done
<br />at the same time as the main dwelling roof.
<br /> $93 CPI, 4.2% increase
<br />vi) Inspection of the installation of an earthquake gas shutoff valve $35 with no Filing & Issuance Fee CPI, 4.2% increase
<br />vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences)$81 plus Filing and Issuance Fee and other miscellaneous fees CPI, 4.2% increase
<br />viii) Photovoltaic Systems
<br />a) Residential
<br />i) Up to 15kW $314 CPI, 4.2% increase
<br />ii) each additional kW over 15kW $16
<br />b) Commercial
<br />i) Up to 25kW $438 CPI, 4.2% increase
<br />ii) 26kW - 50kW $658 CPI, 4.2% increase
<br />iii) each additional kW (51kW - 250kW) $7
<br />iv) each additional kW over 250kW $5
<br />Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other
<br />mandated fees shall not exceed amounts authorized via Government Code Section 66015.
<br />$201 for the first $5,000 plus $40.15 for each add'l $1,000 or fraction thereof, to
<br />and including $10,000
<br />$401 for the first $10,000 plus $13.38 for each additional $1,000 or fraction
<br />thereof over $10,000
<br />$201 for the first $5,000 plus $40.15 for each add'l $1,000 or fraction
<br />thereof, to and including $10,000
<br />$401 for the first $10,000 plus $13.38 for each additional $1,000 or fraction
<br />thereof over $10,000
<br />$421
<br />$631
<br />$7
<br />$5
<br />$301
<br />$16
<br />$280 all sizes and materials
<br />$90
<br />$34 with no Filing & Issuance Fee
<br />$78 plus Filing and Issuance Fee and other miscellaneous fees
<br />$101
<br />$201
<br />$101
<br />$201
<br />3
|