Laserfiche WebLink
Description Current Fee Reference Proposed Fees Explanation <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />B. Permit Fee (continued) <br />iii) Stand-Alone Electrical Permit <br />Up to $2,000 $105 CPI, 4.2% increase <br />$2,001 to $5,000 $209 CPI, 4.2% increase <br />$5,001 to $10,000 $209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to <br />and including $10,000 <br />CPI, 4.2% increase <br />$10,001 and up $418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof <br />over $10,000 <br />CPI, 4.2% increase <br />iv) Stand-Alone Mechanical Permit <br />Up to $2,000 $105 CPI, 4.2% increase <br />$2,001 to $5,000 $209 CPI, 4.2% increase <br />$5,001 to $10,000 $209 for the first $5,000 plus $41.83 for each add'l $1,000 or fraction thereof, to <br />and including $10,000 <br />CPI, 4.2% increase <br />$10,001 and up $418 for the first $10,000 plus $13.94 for each additional $1,000 or fraction thereof <br />over $10,000 <br />CPI, 4.2% increase <br />v) Residential 1 and 2 Family Re-roof <br />a) Main dwelling roof $292 all sizes and materials CPI, 4.2% increase <br />b) Detached garages and accessory structures on same property as main dwelling and done <br />at the same time as the main dwelling roof. <br /> $93 CPI, 4.2% increase <br />vi) Inspection of the installation of an earthquake gas shutoff valve $35 with no Filing & Issuance Fee CPI, 4.2% increase <br />vii) Residential Seismic Retrofit projects using "Plan set A" (for one and two family residences)$81 plus Filing and Issuance Fee and other miscellaneous fees CPI, 4.2% increase <br />viii) Photovoltaic Systems <br />a) Residential <br />i) Up to 15kW $314 CPI, 4.2% increase <br />ii) each additional kW over 15kW $16 <br />b) Commercial <br />i) Up to 25kW $438 CPI, 4.2% increase <br />ii) 26kW - 50kW $658 CPI, 4.2% increase <br />iii) each additional kW (51kW - 250kW) $7 <br />iv) each additional kW over 250kW $5 <br />Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other <br />mandated fees shall not exceed amounts authorized via Government Code Section 66015. <br />$201 for the first $5,000 plus $40.15 for each add'l $1,000 or fraction thereof, to <br />and including $10,000 <br />$401 for the first $10,000 plus $13.38 for each additional $1,000 or fraction <br />thereof over $10,000 <br />$201 for the first $5,000 plus $40.15 for each add'l $1,000 or fraction <br />thereof, to and including $10,000 <br />$401 for the first $10,000 plus $13.38 for each additional $1,000 or fraction <br />thereof over $10,000 <br />$421 <br />$631 <br />$7 <br />$5 <br />$301 <br />$16 <br />$280 all sizes and materials <br />$90 <br />$34 with no Filing & Issuance Fee <br />$78 plus Filing and Issuance Fee and other miscellaneous fees <br />$101 <br />$201 <br />$101 <br />$201 <br />3