Laserfiche WebLink
BID SUMMARY <br /> <br />Phase 1 <br />BID OPENING Azul Works, Inc.Bay Cities Paving & Grading, Inc.DeSilva Gates Construction, LLC <br />DATE: April 14, 2022 1400 Egbert Avenue 1450 Civic Ct., Bldg. B - #400 11555 Dublin Boulevard <br />TIME: 3:00 pm San Francisco, CA 94124 Concord, CA 94520 Dublin, CA 94568 <br />LOCATION: City Clerk's Office Phone: (415) 558-1507 Phone: (925) 687-6666 Phone: (925) 829-9220 <br />Fax: (415) 558-1556 Fax: (925) 687-2122 Fax: (925) 803-4263 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST UNIT COST UNIT COST <br />Prepared by: N. Castelino <br />Date Approved: 3/9/2022 <br />ENGINEER'S ESTIMATE <br />ITEM COST <br />PROJECT TITLE: <br />PROJECT NO.: <br />BID NO.: <br />QUANTITY <br />Annual Street Overlay/Rehabilitation 19-21 <br />2020.0050 <br />21-22.009 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />ITEM COSTITEM COST <br />35 Remove FDR with Cement per <br />Section 302-1 571 CY 100.00$ $57,100.00 $100.00 $57,100.00 $105.65 $60,326.15 $160.00 $91,360.00 <br />36 Compact Existing Street Base or <br />Subgrade Material per Section <br />301-1 <br />11,565 SY $ 6.00 $69,390.00 $0.30 $3,469.50 $3.25 $37,586.25 $3.00 $34,695.00 <br />37 Subgrade Over-Excavation <br />(Revocable Item) per Section 301- <br />1.3 <br />848 CY $ 300.00 $254,400.00 $320.00 $271,360.00 $141.20 $119,737.60 $220.00 $186,560.00 <br />38 Full Depth Reclamation with <br />Portland Cement (8-inch Depth) <br />per Section 301-3.4 <br />4,728 SY $ 10.00 $47,280.00 $1.80 $8,510.40 $8.15 $38,533.20 $15.00 $70,920.00 <br />39 Full Depth Reclamation with <br />Portland Cement (9.5-inch Depth) <br />per Section 301-3.4 <br />797 SY $ 12.00 $9,564.00 $4.00 $3,188.00 $14.65 $11,676.05 $17.00 $13,549.00 <br />40 Full Depth Reclamation with <br />Portland Cement (10.5-inch <br />Depth) per Section 301-3.4 <br />3,506 SY $ 12.00 $42,072.00 $4.00 $14,024.00 $11.55 $40,494.30 $20.00 $70,120.00 <br />41 Soil Stabilization at Shallow <br />Utilities per Section 3.4.9.1 88 SY $ 50.00 $4,400.00 $12.00 $1,056.00 $56.85 $5,002.80 $70.00 $6,160.00 <br />42 Portland Cement for FDR per <br />Section 3.4.2.1 187 TON $ 175.00 $32,725.00 $200.00 $37,400.00 $200.00 $37,400.00 $180.00 $33,660.00 <br />43 HMA Paving per Section 302-5 4,317 TON $ 130.00 $561,210.00 $144.00 $621,648.00 $133.85 $577,830.45 $130.00 $561,210.00 <br />44 RHMA Paving per Section 302-9 3,783 TON $ 160.00 $605,280.00 $180.00 $680,940.00 $202.45 $765,868.35 $140.00 $529,620.00 <br />45 Remove Traffic Markers, <br />Markings, Striping, and Signage <br />per Sections 300-1.3, 314-2, and <br />314-3 <br />1 LS $ 10,000.00 $10,000.00 $54,000.00 $54,000.00 $15,500.00 $15,500.00 $15,000.00 $15,000.00 <br />Bid Summary - Annual Street Overlay Rehabilitation 19-21 Phase 1.xlsx Page 4 of 6 Printed 4/15/2022 @ 1:07 PM