Laserfiche WebLink
Material And Force Account Estimate <br /> CITY OF SAN LEANDRO <br />Estimate Creation Date: 02/22/2021 Number: 133032 Version: 1 <br /> Estimate Good Until 11/22/21 <br />Location: NILES SUB, SIMN, 13.66-29.79 <br />Buy America: Yes <br />Description of Work: SAN LEANDRO, CA, HALCYON DRIVE, M.P. 16.74, NILES SUBDIVISION, 749744E, <br />WO#55071, PID#106632, (100% RECOLLECTABLE) <br />COMMENTS Description QTY UOM Unit LABOR MATERIAL TOTAL <br />Cost <br />SIGNAL <br />Xing - Engineering Design 1 LS 18,486.00 18,486 0 18,486 <br />2 NEW GATES Xing - 1 Trk CWE w/Gates 1 EA 131,584.00 41,200 90,384 131,584 <br />Xing - Track Card (Main and <br />Stand-by) New Cable <br />1 EA 12,889.00 6,000 6,889 12,889 <br />2 PED FLASHERS Xing - Flasher/Ped (pair)1 LS 57,560.00 16,000 41,560 57,560 <br />Xing - Dax Cable 1000'8 EA 6,440.00 32,000 19,520 51,520 <br />CANTILEVER G & F Xing - Cantilever Arm <41'52 LF 767.00 0 39,884 39,884 <br />CANTILEVER G & F Xing - Cantilever Mast <37' Cant 2 EA 23,613.00 37,500 9,726 47,226 <br />Xing - IJ 1 PR 9,000.00 4,498 4,502 9,000 <br />Xing - Intermediate Signal 1 EA 13,165.00 5,536 7,629 13,165 <br />Xing - IXS Track Circuit 1 EA 14,951.00 5,536 9,415 14,951 <br />Xing - Meter Service 1 LS 15,000.00 0 15,000 15,000 <br />Xing - Fill/Rock/Gravel 1 LS 25,000.00 0 25,000 25,000 <br />Xing - Boring 1 LS 10,000.00 0 10,000 10,000 <br />Xing - Contract Services for <br />Preempt Cutover <br />1 LS 20,000.00 0 20,000 20,000 <br />Xing - Remove Location (Gates)1 LS 2,000.00 2,000 0 2,000 <br />FEDERAL 184.71% (SIG)Xing - Labor Additive 1 LS 311,711.05 311,711 0 311,711 <br />Sub-Total = 480,467 299,509 779,976 <br />Totals = 480,467 299,509 779,976 <br />Grand Total = $779,976 <br />This is a preliminary estimate, intended to provide a ballpark cost to determine whether a proposed <br />project warrants further study. This estimate is not to be used for budget authority. Quantities <br />and costs are estimated using readily available information and experience with similar projects. Site <br />conditions and changes in project scope and design may result in significant cost variance. <br /> ____________________________________________________________________________________________________________________________________ <br /> Monday, February 22, 2021 Page 1 of 1