My WebLink
|
Help
|
About
|
Sign Out
Home
11B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
11B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 1:20:53 PM
Creation date
6/28/2022 1:00:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-085 Approving Third Addendum and Planning Entitlements
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-086 2nd amendment to DDA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br />Page 6 PlaceWorks <br /> Small amphitheater <br /> Pedestrian/bicycle bridge across the existing harbor entrance <br /> Boardwalk/lookout pier <br /> Dockside pedestrian lookout piers along the interior of the harbor <br /> Small boat launch in the interior of the harbor <br /> Kayak storage building in interior of harbor <br /> Aeration fountain in harbor basin to aid in water circulation <br /> Existing restrooms ‘J/K’ (refurbished) located on Pescador Point Road <br />2.2 FIRST ADDENDUM <br /> In 2020, modifications to the approved project, which were analyzed in the First Addendum, included <br />the following: <br /> General Plan amendment to designate the site as a combination of General Commercial, Parks <br />and Recreation, Medium Density Residential, and High Density Residential, and <br />expanding/altering the geographic areas of existing General Plan designations on the project site. <br /> Rezoning to reduce the acreage of CC (PD) Commercial Community (Planned Development), <br />increase the acreage of Commercial Recreation (CR) and RM-2000 (PD) Multi-Family Residential <br />(<22 du/ac) (Planned Development), as well as add RM-1800(PD) Residential Multi-Family (<24 <br />du/ac) (Planned Development). <br /> Eliminating the 150,000 square-foot office campus <br /> Shifting the location of the proposed hotel approximately 1,300 feet inland <br /> Changing the 15,000 square-foot conference center into a combined banquet/restaurant space <br />and shifting it approximately 275 feet inland <br /> Increasing the number of housing units from 354 to 485, including: <br />o Eliminating all 61 condominiums <br />o Increasing the number of apartment units from 159 to 285 with integrated structured <br />parking <br />o Decreasing the number of townhomes from 92 to 48 <br />o Increasing the number of single-family homes from 42 to 152 <br /> Eliminating the 8,000 square-foot restaurant at the end of Mulford Point
The URL can be used to link to this page
Your browser does not support the video tag.