My WebLink
|
Help
|
About
|
Sign Out
Home
11B Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
11B Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 1:20:53 PM
Creation date
6/28/2022 1:00:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-085 Approving Third Addendum and Planning Entitlements
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Reso 2022-086 2nd amendment to DDA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO SHORELINE DEVELOPMENT EIR ADDENDUM PROJECT <br />CITY OF SAN LEANDRO <br /> <br />Page 66 PlaceWorks <br />4.20 WILDFIRE <br />4.20.1 IMPACTS ASSOCIATED WITH THE MODIFIED PROJECT <br />If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, <br />would the project: <br />Environmental Issues <br />Substantial <br />Change in <br />Project <br />Requiring <br />Major <br />EIR/MND <br />Revisions <br />Substantial <br />Change in <br />Circumstanc <br />es Requiring <br />Major <br />EIR/MND <br />Revisions <br />New <br />Information <br />Showing <br />New or <br />Increased <br />Significant <br />Effects <br />Less Than <br />Significant <br />Impacts/No <br />Changes or <br />New <br />Information <br />Requiring <br />Preparation <br />of a <br />Subsequent <br />EIR/MND No Impact <br />a) Substantially impair an adopted <br />emergency response plan or emergency <br />evacuation plan? <br /> x <br />b) Due to slope, prevailing winds, and <br />other factors, exacerbate wildfire risks, and <br />thereby expose project occupants to, <br />pollutant concentrations from a wildfire or <br />the uncontrolled spread of a wildfire? <br /> x <br />c) Require the installation or <br />maintenance of associated infrastructure <br />(such as roads, fuel breaks, emergency water <br />sources, power lines or other utilities) that <br />may exacerbate fire risk or that may result in <br />temporary or ongoing impacts to the <br />environment? <br /> x <br />d) Expose people or structures to <br />significant risks, including downslope or <br />downstream flooding or landslides, as a <br />result of runoff, post-fire slope instability, or <br />drainage changes? <br /> x <br /> <br />Background: <br />2022 Appendix G Threshold <br />The CEQA Checklist Guidelines for Wildfire were added since those used for the Certified EIR of the <br />Original Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.