Laserfiche WebLink
Sou rcewel l <br />Detailed Scope of Work <br />To: Alex Cho <br />Angeles Contractor Inc. <br />783 Phillips Drive <br />City of Industry, CA 91748 <br />(714)443-3655 <br />Date Printed: April 18, 2022 <br />Work Order Number: 099276 00 <br />Work Order Title: Monarch Bay Golf Course - Parking Lot <br />Brief Scope: Monarch Bay Golf Course - Parking Lot <br />Preliminary Revised <br />G OR D IAN <br />From: David Sams <br />City of San Leandro <br />835 East 14th Street <br />San Leandro, CA 94577 <br />(510)B95-2162 <br />Final <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items <br />set forth below shall be considered part of this scope of work. <br />Angeles contractor to furnish and Provide all materials, fixtures, equipment, and labor as necessary to complete work. <br />Work to be performcd during regular business hottrs 7 AM to 5 PM, Monday - Friday. <br />(Scope of Work) <br />• Saw cut & iastall approximately 10 LF of Trench Drain and connect it to the existing lmdet^ground drain <br />pipe <br />• Cape seal (approximately 95,600 SF) and 285 parking stalls striping <br />• Apply PRME Tack Oil to asphalt (Cape seal) <br />• Apply 1 layer of 114"x #10 Chips (Cape seal) <br />• Apply 1 layer of Type 11 Shury seal (Cape seal) <br />• Remove existing pathway asphalt (approximately 13,500 SF) and regrade the subgrade <br />• Remove approximately 11,000 SF of (E) asphalt for (N) concrete valley gutters in the parking lot <br />• Remove and provide 3" thick asphalt at pathway (approximately 13,500 SF) <br />• Provide 6" wide of the flush curb at the entrance of pathway (approximately 35 LF) <br />• Provide 3' wide concrete valley gutter in front of the golf -call building (92 LF) <br />• Provide 4' wide concrete valley gutter in the parking lot (375 LF) <br />• Provide 3 EA curb ramps with truncated domes <br />• Provide new (11) ADAsigns <br />• Comply Vvith (11) ADA parking requirements and striping <br />• Concrete club painting (red) <br />Subject to the terms and conditions of EZIQC Contract CA08-SCI-GB05.080719-ACI. <br />Non -Professional Services Agreement between June 6, 2022 <br />City of San Leandro and Angeles Contractor, Inc. — Exhibit A Page 2 of 12 <br />