My WebLink
|
Help
|
About
|
Sign Out
Home
9T Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2022
>
Packet 06212022
>
9T Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2022 4:02:50 PM
Creation date
6/28/2022 1:22:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
6/21/2022
Retention
PERM
Document Relationships
Reso 2022-102 Angeles Contractor CSA
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sou rcewel l <br />Detailed Scope of Work <br />To: Alex Cho <br />Angeles Contractor Inc. <br />783 Phillips Drive <br />City of Industry, CA 91748 <br />(714)443-3655 <br />Date Printed: April 18, 2022 <br />Work Order Number: 099276 00 <br />Work Order Title: Monarch Bay Golf Course - Parking Lot <br />Brief Scope: Monarch Bay Golf Course - Parking Lot <br />Preliminary Revised <br />G OR D IAN <br />From: David Sams <br />City of San Leandro <br />835 East 14th Street <br />San Leandro, CA 94577 <br />(510)B95-2162 <br />Final <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items <br />set forth below shall be considered part of this scope of work. <br />Angeles contractor to furnish and Provide all materials, fixtures, equipment, and labor as necessary to complete work. <br />Work to be performcd during regular business hottrs 7 AM to 5 PM, Monday - Friday. <br />(Scope of Work) <br />• Saw cut & iastall approximately 10 LF of Trench Drain and connect it to the existing lmdet^ground drain <br />pipe <br />• Cape seal (approximately 95,600 SF) and 285 parking stalls striping <br />• Apply PRME Tack Oil to asphalt (Cape seal) <br />• Apply 1 layer of 114"x #10 Chips (Cape seal) <br />• Apply 1 layer of Type 11 Shury seal (Cape seal) <br />• Remove existing pathway asphalt (approximately 13,500 SF) and regrade the subgrade <br />• Remove approximately 11,000 SF of (E) asphalt for (N) concrete valley gutters in the parking lot <br />• Remove and provide 3" thick asphalt at pathway (approximately 13,500 SF) <br />• Provide 6" wide of the flush curb at the entrance of pathway (approximately 35 LF) <br />• Provide 3' wide concrete valley gutter in front of the golf -call building (92 LF) <br />• Provide 4' wide concrete valley gutter in the parking lot (375 LF) <br />• Provide 3 EA curb ramps with truncated domes <br />• Provide new (11) ADAsigns <br />• Comply Vvith (11) ADA parking requirements and striping <br />• Concrete club painting (red) <br />Subject to the terms and conditions of EZIQC Contract CA08-SCI-GB05.080719-ACI. <br />Non -Professional Services Agreement between June 6, 2022 <br />City of San Leandro and Angeles Contractor, Inc. — Exhibit A Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.