My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2002-016 to 2002-020
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2002
>
MO 2002-016 to 2002-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 12:18:56 PM
Creation date
7/12/2022 12:15:32 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2002
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John Jermanis <br />February 11, 2002 <br />Page 5 <br />spreadsheet which fails to increase the EBMUD contract rate by 3.5% in years 6, 7 and 8; <br />and our belief that the overhead charge (beginning at $709,000 and escalating at 3.5% per <br />year) should be included in the economic analysis. <br />The Collection System <br />The City of San Leandro is an old city by California standards, and critical pieces of the <br />City's sewerage system were built between 40 and 60 years ago. The City is in the midst <br />of a major program of repairing, relining and replacing major sewerage collection lines at <br />this time, having been alerted to the serious nature of system problems by the extremely <br />wet winter of 1998. <br />While that repair/replacement program is nearly complete, the City faces an equally <br />serious problem in its neighborhood collection system, including the non-public laterals <br />which connect individual homes and businesses to the publicly owned system. In the <br />near future the City needs to commence a major, long-term program of repair and <br />replacement of secondary sewer system lines. The estimated cost of this program over <br />the next few years is expected to be approximately $43 million. <br />Effect on Sewer Rates <br />The City's wastewater user charges cover both the cost of providing wastewater <br />collection and treatment service (labor, chemicals, energy, etc.) and the cost of providing <br />replacement funding for the Enterprise's capital assets. Included in the latter cost are the <br />current costs of replacing old and deteriorating sewerage collection pipes as described in <br />the paragraph above. <br />The City currently budgets approximately $4.6 million dollars annually for water <br />pollution control (including both treatment and collection). If the City contracted for <br />treatment services with EBMUD the rates would not go down. Instead, staff would take <br />the $5,000,000 of pre -paid rent and the $1,000,000 of budgeted Plant capital <br />improvement cash and direct that money towards the $43 million of City collection <br />system capital improvement project described above. Regardless of the City's choice for <br />future wastewater treatment, staff will recommend a wastewater rate increase of between <br />5% and 6% each year over the next two years. This rate increase is needed not only to <br />fund the capital improvement program described above, but will be needed to fund <br />additional replacement reserves and the increased costs of current operations. <br />The portion of the rate increase related to capital improvements and replacement reserves <br />is 70% of the total increase. Given the identified level of collection system capital <br />improvements (not including any additional funds for replacement reserves), the $6 <br />1::�3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.