My WebLink
|
Help
|
About
|
Sign Out
Home
MO 2001-066 to 2001-070
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
2001
>
MO 2001-066 to 2001-070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:36:41 PM
Creation date
7/12/2022 1:36:05 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/2001
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: <br />TO: <br />FROM: <br />BY: <br />July 9, 2001 <br />John Jermanis, City Manag <br />William K. Algire, Direct r <br />Engineering and Transpo ation artment ,1 <br />Uchenna Udemezue, P.E., City Engineer <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />:APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL 2eso <br />zo rem <br />John �ermanis ©, - `0 1 <br />City alter (act 1 a) <br />RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND <br />AUTHORIZING THE CALL FOR BIDS FOR THE MARINA ENTRANCE <br />IMPROVEMENT PROJECT, PROJECT NO. 01-597-57-122 <br />SUMMARY AND RECOMMENDATION <br />Staff recommends the approval of the plans and specifications and authorizing the <br />call for bids on the subject project. <br />BACKGROUND <br />The 1997-98 budget approved by Resolution No. 97-68 provided for the <br />improvement of the northern Marina Entrance. This improvement will provide an <br />entryway statement to the Marina waterfront, complimenting the Fairway Drive <br />entryway statement to the Marina. To achieve this goal, the City hired a <br />landscape architectural firm, John Cahalan, for this project. <br />In October 2000, staff presented the schematic design to the Facilities Committee <br />and was directed to proceed with preparation of construction documents. The <br />improvement will install a lighted entryway monument sign with sculpture, raised <br />landscaped concrete median and bike trail into the Marina. The sculpture will be <br />bid under a separate contract and will be of the image of birds in flight. The <br />project will also construct automatic irrigated landscaping and concrete seat walls <br />at the entry sign location. <br />Roadway improvements at the Marina Boulevard/Neptune Drive intersection will <br />channel traffic to limit traffic movement onto residential Neptune Drive. <br />"c-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.