Laserfiche WebLink
SAN )RO ADM MSTRATRATIVE CODE <br />TITLE 6 FINANCE <br />Chapter 4 Fees <br />r' d <br />2000-01 <br />Proposed <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAC) or the general laws of the State of California. <br />F- r Descrintion I Current Fee I Reference I I <br />DEVELOPMENT SERVICES DEPARTMENT - Building Regulations Division <br />1. <br />Plans and Specifications <br />i <br />See Engineering & Transportation Department <br />Item 9. Public Work Projects <br />� <br />� I <br />Building Permit <br />I <br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG <br />MOTION (EARTHQUAKE) INSTRUMENTATION PROGRM (S.M.I.P.) FEE MANDATED BY THE STATE OF <br />CALIFORNIA AND COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE <br />PERMIT FEES. j <br />I <br />E <br />a. Issuance Fee _ <br />$22.00 plus total valuation fee, as listed below— <br />Mum fee for one inspection <br />$48.00 <br />l <br />------- <br />Building Permits requiring more than one <br />inspection, other than for those requiring return <br />inspections for corrections from a previous <br />inspection, have a minimum fee of <br />_ <br />$106.00 <br />j <br />I <br />� <br />All -Inclusive Permit: Work involving a One issuance fee plus <br />combination of building and/or mechanical, One permit fee plus <br />electrical and plumbing, with a value of less than Items from respective fee tables <br />$3,000: <br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the <br />City are not congruent with this fee schedule.) <br />I <br />f <br />; <br />l <br />f6� 5115100 3 Exhibit A <br />