My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1998-026 to 1998-030
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1998
>
MO 1998-026 to 1998-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 4:08:12 PM
Creation date
7/12/2022 4:05:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1998-99 CIP LISTING o�g� Page t <br />FP 8-3 Halcyon Park Restroom Construction <br />This project includes construction of a replacement of the existing public restrooms at Halcyon <br />Park. <br />Budget Estimate: $260,000 FY 1998-99 <br />FP 12C Casa Peralta Interior Repairs and Painting <br />Repair and painting of interior water damaged walls, floors, ceilings <br />and window frames. <br />Budget Estimate: $90,000 <br />Budget: $30,000 FY 1997-98 <br />Budget: $60,000 FY 1998-99 <br />FP 18 Marina Park Small Boat Lagoon Bank Erosion Repair <br />This project will design and construct the needed bank repairs to halt <br />erosion in the Marina Park Small Boat Lagoon. <br />Budget Estimate: $375,000 <br />Budget: $125,000 FY 1997-98 <br />Budget: $125,000 FY 1998-99 <br />Budget: $125,000 FY 1999-00 <br />FP 22 City -Wide Parks Upgrade <br />This project provides an annual sinking fund to upgrade the City parks as defined in the 1995/96 <br />CIP City parks needs assessment. <br />Budget Estimate: $150,000 <br />B 2 Painting City Buildings <br />Annual budget for painting of City Buildings. <br />- $50,000), City Garage (interior/exterior <br />Library <br />Budget Estimate: $50,000 <br />Budget: $77,800 <br />Budget: $40,000 <br />Budget: $50,000 <br />FB 11 Fire/Fuel Tank Removal and Above Ground Tanks <br />FY 1998-99 <br />FY 1997/98: Halcyon Recreation Building (exterior <br />$27,800) FY 1998/99: Mulford/Marina Branch <br />Annually <br />FY 1997-98 <br />FY 1998-99 <br />FY 1999-00 <br />This project provides for the upgrading of underground storage tanks at various locations in the <br />City to meet EPA/State Standards. As this work must be completed by December 1998, money <br />for the work is being advanced from the CIP Reserves (1997/98) and the money initially <br />appropriated for the Above -Ground Storage Tanks at the Fire Stations #10, 11 & 13. This request <br />will provide funding to replenish the CIP Reserves as well as the Above -Ground Tanks funding. <br />Budget Estimate: $148,000 <br />Budget: $148,000 FY 1998-99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.