My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1998-026 to 1998-030
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1998
>
MO 1998-026 to 1998-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 4:08:12 PM
Creation date
7/12/2022 4:05:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1998-99 CIP LISTING <br />Page 3 <br />NT 1 Railroad (Southern Pacific) Crossing Concrete Upgrade <br />Upgrade crossings at Williams Street east of Doolittle, Williams eastbound Main Line and Williams <br />westbound Main Line with a 10% match with a S.P. Grant. Upgrade the crossings at Farallon <br />Drive south of Griffith Street and Farallon Drive west of Griffith Street and other selected damaged <br />crossings in the City with a construction material and conform work match with U..P.R.R.. <br />Budget Estimate: $116,000 <br />Budget: $60,000 FY 1996-97 <br />Budget: $56,000 FY 1997-98 <br />Budget: $85,000 FY 1998-99 <br />NT 5 Neighborhood Traffic Mitigation Program <br />Annual funding of $50,000 to design and construct temporary and permanent neighbor -hood traffic <br />control devises including speed humps, traffic circles, chicanes, one-way entrances/exits, and <br />median closures. <br />Budget Estimate: $200,000 <br />Budget $50,000 FY 1996-97 <br />Budget $50,000 FY 1997-98 <br />Budget $50,000 FY 1998-99 <br />Budget $50,000 FY 1999-00 <br />NT 7 Signal Interconnect System <br />Implement signal coordination and timing along City arterials. <br />Budget Estimate: $459,000 (TSM) FY 1997-98 <br />Budget $65,000 FY 1998-99 <br />Budget $65,000 FY 1999-00 <br />NT 11 Pavement Management Supplement <br />Funds use to augment the Annual Street Sealing Program and Annual Overlay and Rehabilitation <br />Program. <br />Budget Estimate: $ 400,000 Annually <br />Budget: $ 400,000 FY 1997-98 <br />Budget: $ 400,000 FY 1998-99 <br />Budget: $ 400,000 FY 1999-00 <br />Budget: $ 400,000 FY 2000-01 <br />R 1 City-wide Wheelchair Ramps <br />The City's annual $15,000 contribution from the CDBG or TDA program to install <br />handicapped/disabled curb ramps on various streets. Project is coordinated by the Traffic Division. <br />Criteria is related to transportation and proximity to essential services for the disabled. <br />Budget Estimate: $15,000 Annually <br />Budget: $40,600 TDA FY 1997-98 <br />$15,000 CDBG <br />
The URL can be used to link to this page
Your browser does not support the video tag.