Laserfiche WebLink
10/14/97 19:39 $510 278 6547 EBDA BOB ROC <br />1 5.2.2 Replacement of the electric motors at the Oro Loma Pump Station <br />2 6.2.3 Replacement of the variable frequency drive units at the Oro Loma <br />3 Pump Station <br />4 5.2.4 Modifications and upgrades to the pump control system at the Oro <br />5 Loma Pump Station <br />6 5.2.5 Installation of a stand-by diesel generator at the San Leandro Pump <br />7 Station <br />8 5.3 The fees described in 5.1 and 5.2 above, shall accrue interest to protect <br />9 against inflation, as described in Exhibit "B", attached hereto and made a part hereof as <br />10 though fully set forth herein. The annual interest rate applied shall not be less that 3% <br />11 per annum, nor more than 6%. <br />12 6. Peak Wet Weather Flow <br />13 6.1 It is recognized by the parties that LAVWMA is still in the planning and <br />14 design stages of its expansion project. Currently the PWWF is anticipated to be <br />t4 im 41.2 MGD iiu a t do <br />�..... �.,...... j:, <br />15...,.... <br />16 6.2 Should LAVWMA's planning and design process result in a request for a <br />17 PWWF figure other than 41.2 MGD, then the table in Paragraph 3 of Exhibit "A" shall be <br />18 revised accordingly. The maximum PWWF for each five year time period shall be equally <br />19 proportioned between 21.00 MGD and the new maximum PWWF requested. The <br />20 formulas in Paragraph 3 of Exhibit "A" for fixed cost percentage shall apply, including the <br />21 formula in Subparagraph 3.5 for the new discount rate. <br />22 7. Operation of System. <br />23 7.1 Both parties shall operate and maintain their respective systems so as not <br />24 to damage the other party's system. LAVWMA shall plan for and provide storage or <br />draft 3 rev. 0 2 per joint mtng, mte, WG, Haywardan ) 6 cto er 14, 1997 <br />