Laserfiche WebLink
16 <br /> <br />ongoing basis, including the removal of nuisance vegetation and providing security personnel as <br />may be required. Developer shall be eligible for credit against the City Development Impact <br />Fees for some or all of the foregoing work in accordance with Section 3.25 of this Agreement. <br /> <br />3.9. Eastern Portions of Mulford Point and Pescador Point Drives. Developer shall be <br />responsible for design and reconstruction of the portions of Mulford Point and Pescador Point <br />Drives, which are located south of the Developer Hotel Element and to the north of the <br />Multifamily Element, in accordance with the DDA Scope of Development, DDA Schedule of <br />Performance, and the Shoreline Responsibility Map (Exhibit R) to the <br />DDA. Such improvements shall include, but are not limited to, sidewalks, new curb-to-curb <br />pavement, striping, new signage, landscaping, irrigation, new and/or modified utilities, <br />undergrounding of overhead utilities, lighting, stormwater treatment, and pedestrian amenities, <br />subject to final review and approval by the City Engineering and Transportation <br />Director. Developer shall maintain access to existing Mulford Point Drive until the new road is <br />constructed and operational. Developer shall be responsible for any restoration of existing <br />parking lots, driveways, entrances, striping, patching, curb and gutter, landscaping and irrigation <br />that may be required due to impacts related to the Project to provide a code compliant and usable <br />parking lot for existing properties that are not a part of the Project. <br />3.10. Park Element Parking Lot and Western Portion of Mulford Point Drive. <br />Developer shall be responsible for design and construction of portions of Mulford Point Drive <br />located to the west of the Developer Hotel Element and the shared Park Element Parking Lot <br />located to the west of the Developer Hotel Element and the Developer Restaurant Element, in <br />accordance with Section 1.4.11 of the DDA, the DDA Scope of Development, the DDA <br />Schedule of Performance, and the Shoreline Responsibility Map (Exhibit R) of the DDA. City <br />shall provide conceptual drawings for the Park Element Parking Lot. Developer shall be <br />responsible for the preparation of design development drawings and construction drawings, <br />obtaining City and other governmental permits and approvals, and construction of the Park <br />Element Parking Lot. Work shall include, but is not limited to: demolition, Site Preparation, <br />including surcharging, sea level rise mitigation, rough and finish grading (cut/fill), underground <br />utilities, curb cuts, paving sections, landscaping and irrigation, trees, water detention areas, <br />SWPPP, concrete, curb and gutter, asphalt, decomposed granite, site lighting, site water, <br />clarifiers, signage, striping, pay stations, and any other elements as may be required for the <br />development of a fully functioning public parking lot. This work shall also include all necessary <br />connections to Mulford Point Drive between the Park Element Parking Lot and Monarch Bay <br />Drive. Developer shall be eligible for credit against the City Development Impact Fees for some <br />or all of the foregoing work in accordance with Section 3.25 of this Agreement. <br />3.11. Property Level and Soil Exportation. In accordance with the requirements of <br />Section 1.4.17 of the DDA, and Mitigation Measure HYDRO-7 of the MMRP, the Developer <br />Project Elements must meet City engineering requirements related to flood plain and sea level <br />rise, with such requirements and the site engineering plans subject to approval of the City <br />Engineering and Transportation Director. In accordance with Mitigation Measure HYDRO-7, <br />the Project shall be designed to be resilient to a mid-century sea level rise projection. If the <br />Project would remain in place longer than mid-century, an adaptive management plan shall be <br />developed to address the long-term impacts that would arise. The results of the risk assessment <br />shall be incorporated into the site design. Such plans shall include provisions related to surcharge