Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />NEIGHBORHOODS - ENTRYWAYS <br />NE 2 Annual Boulevard Street Tree Planting <br />Installation of street trees 40' on center on <br />East 14th Street between Blossom and Elsie. <br />Budget Estimate: $105,000 FY 1996-97 <br />NE 11 Farnsworth/Manor Intersection Landscape Study <br />Budget Estimate: $240,000 <br />Budget: $155,000 FY 1996-97 <br />Budget: $ 85,000 FY 1997-98 <br />NE 21 City-wide Entryway Signs <br />Installation of monuments at City entries such <br />as East 14th Street at Bayfair and Davis <br />Street at I-880. <br />Budget Estimate: $50,000 FY 1996-97 <br />NE 22 Arterial Banner Supplement <br />Install banners along arterial streets similar to <br />those displayed along East 14th Street. <br />Budget Estimate: $50,000 FY 1996-97 <br />NE 23 City-wide Neighborhood Entry Signs <br />/24 Continued program installation of entry <br />monuments in two neighborhoods. <br />Budget Estimate: $15,000 FY 1996-97 <br />Page 6 <br />NE 25 Fairway Drive Median Landscaping and Boulevard <br />Street Trees <br />Installation of street trees and irrigation on <br />both shoulders and on the median on Fairway <br />from Neptune to Aurora and installation of <br />median island landscaping and irrigation <br />system on Fairway Drive from Aurora to <br />Doolittle. <br />Budget Estimate: $250,000 <br />Budget: $150,000 FY 1996-97 <br />Budget: $100,000 FY 1997-98 <br />