Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />STREETS/TRAFFIC/RIGHT-OF-WAY <br />R-3 East 14th Street Lighting/Construction <br />Continuation of the East 14th Street conduit <br />improvements between Warren Avenue and <br />Blossom Street to replace the existing, failing, <br />system. <br />Budget Estimate: $200,000 FY 1996-97 <br />NE 3 East 14th Street Medians <br />Construct a center median from Hays Street <br />to Broadmoor Boulevard on East 14th Street. <br />Budget Estimate: $1,767,000 <br />Budget $ 175,000 FY 1995-96 <br />Budget $ 385,000 FY 1996-97 <br />Budget $1,207,000 FY 1997-98 <br />NT 17 Hesperian Boulevard and Lewelling Boulevard <br />Addition of a right turn lane southbound on <br />Hesperian Boulevard at Lewelling Boulevard. <br />Budget Estimate: $230,000 FY 1996-97 <br />NT 19 Dutton Avenue Storm Drain <br />Design and construction of storm drain system <br />on Dutton Avenue from Superior Avenue to <br />Fortuna Ave. <br />Budget Estimate: $65,000 FY 1996-97 <br />to <br />Cis <br />Page 10-A <br />