Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />MARINA ENTERPRISE <br />FM 2 Marina Pavement Maintenance <br />Perform existing pavement repair followed by <br />cape seal and parking lot striping. <br />Budget Estimate: $115,000 FY 1996-977 <br />FM 4 Marina Boulevard Park Entrance <br />Redesign the main entry to the Marina at the <br />intersection of Marina Boulevard and <br />Neptune Drive. <br />Budget Estimate: $30,000 FY 1996-97 <br />M 2 Riprap Improvements/Repair <br />Design and construction of riprap repairs to <br />the Marina dikes. <br />Budget Estimate: $20,000 FY 1996-97 <br />L� <br />Page 12 <br />