My WebLink
|
Help
|
About
|
Sign Out
Home
MO 1996-011 to 1996-015
CityHall
>
City Clerk
>
City Council
>
Minute Orders
>
1996
>
MO 1996-011 to 1996-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 11:17:42 AM
Creation date
7/14/2022 11:11:04 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Minute Order
Document Date (6)
12/31/1996
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROGRAM <br />WATER POLLUTION CONTROL PLANT ENTERPRISE <br />W 5 Sanitary Sewer Clean/T.V. Inspect/Smoke <br />Test/Repair Program <br />An annual program to clean, T.V. inspect for <br />damage, smoke test for lateral breaks and <br />illegal connections, and repair of damages <br />over the 120 miles of the sanitary sewer pipe <br />system. <br />Budget Estimate: $250,000 Annually <br />W 17 WPCP Sludge Drying Beds Pavement <br />Maintenance <br />Perform crack seal/dig out repairs and cape <br />seal of WPCP sludge drying beds. <br />Budget Estimate: $76,000 FY 1996-97 <br />W 28 WPCP SCADA System Phase III <br />Final phase of Supervisory Control and Data <br />Acquisition (SCADA) project. Purchase and <br />install instrumentation and provides <br />integration of the system into the computer <br />based Management System. <br />Budget Estimate: $100,000 FY 1996-97 <br />W 40 WPCP Back-up Emergency Belt Press <br />Purchase and install an emergency belt press <br />and associated sludge feed line, water supply <br />line, filtrate discharge line and electrical <br />power. <br />Budget Estimate: $450,000 FY 1996-97 <br />C�? <br />Page 16 <br />W 52 Diesel Fuel Tank Closure and Replacement <br />Remove the existing 10,000 gallon fuel tank <br />and replace it with a 5,000 gallon tank and <br />reuse the existing pumping station. <br />Budget Estimate: $67,500 FY 1996-97 <br />W 53 Grease Receiving Station Study <br />Investigate the feasibility of constructing a <br />new grease receiving station at the WPCP. <br />Budget Estimate: $21,000 FY 1996-97 <br />W 54 Valley Area Wastewater Export Study <br />Study the feasibility of diverting the <br />wastewater flow from the valley area currently <br />going to Oro Loma Sanitary District into San <br />Leandro's system to include: design/actual <br />flow rates, pump station locations, force main <br />routes, receiving locations and flow impacts, <br />and cost of each alternative. <br />Budget Estimate: $25,000 FY 1996-97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.