Laserfiche WebLink
I. <br />1995-96 CAPITAL IMPROVEMENT PROJECT <br />ENGINEER'S ESTIMATE <br />FOR <br />Storm Drainage Connection Williams Street to Merced Street <br />UNIT <br />ITEM <br />DESCRIPTION <br />QUANTITY UNIT <br />PRICE <br />AMOUNT <br />1 <br />Mobilization <br />L.S. <br />$4,500 <br />2 <br />Traffic Control <br />1 <br />L.S. <br />$2,000 <br />$2,000 <br />3 <br />Trench Safety <br />1 <br />L.S. <br />$5,000 <br />$5,000 <br />4 <br />12' R.C.P. <br />10 <br />LF, <br />$80 <br />$800 <br />5 <br />18' R.C.P. <br />703 <br />L.F. <br />$90 <br />$63,270 <br />6 <br />24' R.C.P. <br />438 <br />L_F_ <br />$100 <br />S43,800 <br />7 <br />City Std Manhole <br />6 <br />EACH <br />$3,000 <br />$18.000 <br />8 <br />ACFC Manhole <br />1 <br />EACH <br />$3,500 <br />$3,500 <br />9 <br />S'. D. Tie-in @ Williams <br />I <br />L.S. <br />$1,500 <br />$1,500 <br />10 <br />S. D. Tie-in @ Merced <br />1 <br />L.S. <br />$1,600 <br />$1,500 <br />11 <br />Surface restoration A-C. <br />2,620 <br />S.F. <br />$3 <br />$7,560 <br />12 <br />Surface restore Williams 8, Merced <br />400 <br />S.F. <br />S7 <br />$2,800 <br />Subtotal Construction <br />$154,230 <br />Contingencies @ 25WO <br />$38,558 <br />Total Construction <br />$192,788 <br />Easement Aquisition <br />4.600 <br />S.F. <br />$25.000 <br />inCL direct C0sts,appraisal,Iegat <br />Labor Costs <br />Pre Design <br />$10,436 <br />Design <br />$8,340 <br />Construction Support <br />$7,580 <br />Prepared By; Ken Joseph <br />28-Apr-95 <br />TOTAL PROJECT <br />$244,144 <br />Page 1 <br />EXHT)IT A <br />