Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />WORK PROGRAM <br />TASK 1 - DESIGN DEVELOPMENT <br />Subtask 1.1 a) Meet with the City Staff to finalize work program, <br />Orientation scheduling requirements and overall project objectives. <br />b) Obtain existing conditions surveys, current sign <br />program efforts (banner program, City logo, other civic <br />features), and other relevant base information. <br />c) Field trip with City Staff to each potential site to assess <br />existing site conditions including vegetation, adjacent <br />uses, sightlines, utility locations, and clarify limits of <br />City Property available for signage. Photograph each <br />site. <br />Subtask 1.2- a) Collect potential imagery of San Leandro community <br />Alternative and entry features from other communities. <br />Development <br />b) Prepare sketch studies of potential sign options (5-7). <br />c) Meet with City Staff to review imagery options. <br />Identify three options for further refinement. <br />d) Prepare refined sign studies of the three alternatives <br />and schematic plan illustrating potential siting of <br />signage at selected sites. <br />Subtask 1.3- a) Assist the City Staff in preparation for community <br />Initial Workshop workshops; prepare graphic/flyer, identify time and <br />location. <br />b) Prepare colored exhibits for work which will stimulate <br />discussion in addition to elevations and plan rendering <br />exhibits which may include: <br />Exhibit A <br />Page 1 of 4 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />