EXHIBIT A-2 <br />Page 2 of 8 <br />1. Interim and Final Success Criteria <br />Performance criteria have been developed to provide measurable goals against which the success <br />of the WCDP can be assessed. These criteria are presented in Table 5. Most criteria are based <br />on improvements to baseline conditions while a few are based on comparison to reference sites. <br />?. Contingency Measures <br />If monitoring reveals that the interim or final performance criteria are not being substantiall, <br />satisfied, appropriate corrective action will be taken. Corrective actions may include planting of <br />appropriate salt marsh species, such as pickleweed or salt grass or removal of non-nati%e exotic <br />invasive species such as eastern cordgrass (Sparrina alrerniflora). Other corrective measures <br />would include re -grading and re -excavating channels or modifving the water control s\ stem. In <br />the event of an external threat, such as an oil spill in the Bay waters proximate to the WCDP <br />area, and/or upon notification by the Corps, all culverts in the WCDP would be closed. <br />3. Monitoring Methods and Frequency (including tidegate operation) <br />Monitoring A ethods <br />Post -construction environmental monitoring would be carved out under the following fire <br />primary categories: <br />Hydrology/Sedimentation - The hydrologic regime would be monitored by measuring the <br />actual frequency, extent and duration of tidal inundation against that predicted in the <br />Vv'CDP. Water elevation measuring staffs would be placed within the main channels of the <br />'north and Bunker Marsh areas to enable accurate assessment of water depth and elevation. <br />Water depth will be measured in the East Marsh manually (i.e. with a measuring rod) and <br />through visual observation. On an annual basis and during the same season each year, <br />observations of the hydrologic regime within the WCDP area will be made to evaluate <br />tidal range, percent of area inundated, and culvert/channel operation. <br />As -built drawings, including cross -sections of channels, ditches and the marsh plain, shall <br />be submitted to the Corps within three months of completing all init,-'I WCDP grading. <br />The cross -sections shall be monumented and shall be of sufficient number to provide <br />representative indication of over-all marsh topography. During the fifth year of <br />monitoring, the same cross -sections shall be surveyed and the cross-section drawings <br />submitted with that year's annual report. A discussion of any significant elevation changes <br />since construction will also be provided. <br />53 <br />