Laserfiche WebLink
EXHIBIT A-2 <br />Page 4 of 8 <br />TABLE 5: PERFORMANCE CRITERIA FOR WATER CIRCULATION AND DRAINAGE <br />PLAN (Continued) <br />Parameter <br />North Marsh (Continued) <br />Salt Marsh Harvest Increase relative abundance <br />Mouse stabilize populations <br />Birds <br />Increased waterfowl and <br />shorebird use <br />Bunker Marsh/Lower Roberts Landing Slough <br />Hvdrolozv Full tidal restoration <br />Sedimentation Increase sedimentation <br />Vesetation Increase pickleweed <br />vegetation cover to <br />compensate for that lost <br />through channel excavation <br />in RLS. <br />(Continued) <br />Improve mar,,h \egetation <br />quality <br />Criteria <br />4th year - 20cic increase in capture <br />rates relative to past trapping studies <br />at the site or 75% of average of <br />reference sites. <br />5th year - 25c%c increase in capture <br />rates relative to past trapping studies <br />or 80cic of average of reference sites. <br />Increased numbers and abundance of <br />species. <br />Mean high water elevation of 2.5 feet <br />NGVD. <br />Interior channel/ditch bottom <br />elevations should increase by at least <br />0.5 feet within first five years. <br />2nd vear - Establish 0.3 acres of new <br />pickleweed-dominated habitat along <br />and within RLS channel. <br />5th vear - Establish 0.7 acres of nev< <br />pickleweed-dominated habitat along <br />and within RLS channel. <br />I st vear - 59c cover of native <br />halophytes. <br />2nd vear - 109c cover of native <br />halophytes. <br />3rd vear - 209c cover of native <br />halophytes. <br />4th vear - 40ch coverage of native <br />halophytes. <br />5th vear - 50% coverage of native <br />halophytes. <br />C5 <br />