Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6 <br />Chapter 4 <br />FINANCE <br />Fees <br />1996/97 <br />Proposed <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the <br />San Leandro Muncipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />FIRE DEPARTMENT <br />Description <br />Current Fee <br />Reference <br />Proposed <br />1. <br />Fire Reports <br />SLAC 6.4.100 <br />A. Photocopying <br />$ .10 per page <br />2. <br />Permits <br />SLMC 3-3-100 <br />A. Fire Code Permit Fees <br />120.00 (1) <br />140.00 <br />3. <br />Aboveground Hazardous Materials Storage Fees <br />SLMC 3-3-100 <br />A. Storage permit <br />See Exhibit A (1) <br />B. Aboveground Tank Installation (2) <br />165.00/Tank <br />180.00/Tank <br />C. Review of RMMP <br />by Fire personnel <br />60.00/Hr. <br />by outside engineer <br />Direct Cost <br />4. <br />Underground Hazardous Substances Storage Fees <br />SLMC 3-3-265 <br />A. Operating permit <br />Each container <br />I I0.00/yr-each container <br />60.00/Yr <br />B. Calif. State Water Resources Control <br />Board fee (remitted to state) <br />Each container <br />56.00 <br />C. New Tank Installation (2) <br />First container <br />275.00 <br />320.00 <br />Each additional <br />110.00 <br />120.00 <br />D. Remove, Alter, Repair (2) <br />First container <br />220.00 <br />240.00 <br />Each additional <br />110.00 <br />120.00 <br />Each additional hour <br />55.00 <br />60•00 <br />E. Minor Repairs and Alterations Per Project <br />110.00 <br />120.00 <br />F. Oversight of Remedial Actions <br />by Fire personnel <br />55.00/Hr. <br />60.00/Hr. <br />by outside engineer <br />Direct Cost <br />