Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />12.6.100: WELDING. <br />(a) Building Permit The fee for a building permit shall include an issuance fee of $15.50 $16.00 plus <br />the fee based on total valuation of the building or structure in accordance with the following table: <br />Building Permits requiring more than one inspection, other than those requiring return inspections <br />for corrections from a previous inspection, shall have a minimum permit fee of e'er $106.00. <br />The minimum fee for one inspection is Q^� $48.00. <br />For work involving a combination of Building and/or mechanical, electrical, and plumbing, with a <br />value of less than $3, 000, an all-inclusive permit may be issued with one issuance fee, and the <br />minimum permit fee, plus the items from the respective tables. The Building Official may adjust the <br />plan checking/permit fee for an individual project when costs to the City are not congruent with this <br />fee schedule. <br />TOTAL VALUATION* FEE <br />FROM TO & INCLUDING <br />$ l .00 $500.00 $46.75 $48.00 <br />$501.00 $2,000.00 $46.75 $48.00 for the first $500 plus $&.25 $5.50 <br />for each additional $100 or fraction thereof, to <br />and including $2,000. <br />$2,001.00 $50,000.00 Q'�0 $130.00 for the first $2,000 plus $10.50 <br />$10.75 for each additional $1,000 or fraction <br />thereof, to and including $50,000. <br />$ 50,001.00 $100.000.00 $621.75 $646.50 for the first $50,000 plus &7-.M <br />$7.50 for each add. $1,000 or fraction thereof, to <br />and including $100,000. <br />Based on total value of all construction work, as determined by the Building Official, including all finish work, <br />painting, roofmg, electrical, plumbing, heating, air conditioning, elevators, fire -extinguishing systems and any <br />other permanent equipment. <br />06-03-96 1 Building Code <br />