Laserfiche WebLink
SAN LEANDRO ADIVIINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />Water Piping: <br />Water line and first 10 openings 10.0010.25 <br />Each additional opening 4-.051.25 <br />Replacement or abandonment of water service, each 10.0010.25 <br />Irrigation sprinkler system and first 20 heads 20.50 21. 00 <br />Each additional head 40.35 <br />Installation, alteration or repair of water piping <br />and/or water treating or using equipment, each <br />10.25 10.50 <br />Water Heaters (gas or electric): <br />Under 90 gallons, each <br />30.00 <br />Over 90 gallons, each <br />60.00 <br />T & P valve, each <br />N/C <br />Vacuum Breakers or Back -flow Devices: <br />Four or less <br />7-.� 8.00 <br />Each additional <br />4—.75 2. 00 <br />Swimming Pools: <br />Private, each <br />61.23 62.50 <br />Public, each <br />102.00104.00 <br />In -ground Spas <br />61.25 62.50 <br />Sewers and Storm Drains: <br />Storm drain or building sewer per <br />100 feet or faction thereof. <br />15.5016.00 <br />Building court connection to main sewer, each <br />23.00 23.50 <br />06-03-96 9 <br />Plumbing Code <br />