Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />Septic tank outfit complete, each 46.00 47.00 <br />Building court house connected <br />to building court main, end 45.5016.00 <br />Sewer extension, each. 15.5016.00 <br />Site sewer to property or easement line, new or repairs <br />20.50 21.00 <br />Temporary privy or vault (chemical toilet), each <br />13.2513.50 <br />Building side sewer lateral from <br />main in street to each property line <br />23.2524. 00 <br />Building side sewer abandonment or sewer plug, each <br />14.50 14.75 <br />Building site sewer to replace septic tank, each <br />23.00 23.50 <br />Storm water or rain leader connection <br />to a public storm sewer, each <br />23.00 23.50 <br />Gas Piping and Oil Piping: <br />Minimum Fee (one or two outlets) <br />3�S 5.50 <br />Exemption: Inspection of the installation of an <br />earthquake gas shutoff valve shall be <br />exempt from the Minimum Fee for Gas <br />Piping and Oil Piping. <br />Each gas outlet over two 2453.00 <br />Each gas meter over one (same time & place) 3403.75 <br />Gas Line Test, each test. i0.7511.00 <br />Gas line lock out test, each 20.50 21. 00 <br />Fuel oil or liquified petroleum gas storage tanks, <br />demolition or new tanks and piping to building, each 6.00 <br />Clothes dryer - residential, each. 6477. 00 <br />06-03-96 11 Plumbing Code <br />