Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 DEVELOPMENT SERVICES DEPARTMENT <br />Chapter 6 Fee Schedule - Building Regulations <br />Industrial and commercial heating equipment, each. <br />12:0012.25 <br />Alterations or changes of any control system or <br />ventilating system from original installation <br />9�0 9.75 <br />Small burner of not over 15,000 BTU per hour, steam table <br />sterilizers, laboratory burners, coffee urn burners, gas <br />plates and similar devices, each <br />6�5 7.00 <br />Fans or blowers connected to any heating system which <br />are not part of the furnace, each <br />6-.7-5 7.00 <br />Commercial range hoods, including vent, each <br />26 00 26.50 <br />Flues: <br />Minimum (one or two flues) <br />-7�. 8.00 <br />Each flue over two (each) <br />47745.00 <br />Ventilating Systems for Kitchen, Bath, etc.,: <br />Minimum (one or two systems) <br />7-.74 8.00 <br />Each system over two <br />6-.74 7.00 <br />General Mechanical: <br />Incinerators - domestic, each <br />11.5011.75 <br />Incinerators - commercial/industrial, each <br />46.00 47.00 <br />Garbage chutes, each <br />15-5015.75 <br />Fire dampers, each <br />6-.75 7.00 <br />Smog control after burners, commercial/industrial, <br />each system <br />31.00 31.75 <br />Refrigeration system - commercial/industrial, <br />each system <br />40.00 40. 75 <br />06-03-96 15 Htg/Vent/Air/Mech Code <br />