Laserfiche WebLink
95% Submittal - (1) Quantities and Cost Estimate in a three-ring binder. <br />100% Submittal - The Contractor shall submit (1) one set of signed and <br />stamped mylar drawings; (2) three sets of prints; (3) 3.5" <br />diskettes with complete files for all drawings, in AutoCad <br />Ver. 12 compatible format; (4) one bound copy and one <br />unbound copy of the specifications; (5) 3.5" diskettes with <br />complete files for specification in either Microsoft Word <br />6.0 for Windows or WordPerfect 5.1 for DOS format; (6) <br />design calculations in a three-ring binder; (7) Probable <br />Construction Schedule; (8) Recommendations for Special <br />Construction Procedures or Sequences <br />All final drawings, specifications and calculations shall be signed and <br />stamped by the appropriate registered engineer, licensed in the State of <br />California. <br />For all of the submittals that include drawings the Contractor shall provide <br />one set of half -sized drawings on 11x17 sheet of bond paper. <br />PHASE 3. BIDDING AND PERMIT SUPPORT <br />1. Technical services as follows: <br />a. Building Permit - The Contractor shall provide copies of <br />plans, specifications, and calculations as indicated above; <br />assist in application for the building permit; and resolve <br />questions that may arise during the permitting process. <br />b. Pre -bid Conference - The Contractor shall attend the pre -bid <br />meeting. <br />C. Clarifications - The Contractor shall issue written <br />clarifications to the drawings and specifications as <br />necessary during the bid period. <br />d. Bid Evaluations - The Contractor shall assist the City in <br />evaluating the bids and shall make recommendations for <br />awarding the construction contract. <br />e. Pre -construction Conference - The Contractor shall attend a <br />pre -construction meeting to go over the construction methods <br />or procedures with the construction contractor. <br />Phase 2 & 3 Construction Documents and Bidding Schedule: <br />Time Span Activity <br />1 day after Start Phase 2 - Construction Documents <br />City Council Approval <br />Exhibit A <br />Page 5 of 6 <br />9/26/88 Rev. <br />1/10/90 Rev. <br />